-5-
STEP
2
Fix the top and bottom frames on the wall jamb.
Before fixing top and bottom frames, make sure of the following: 1. Wall and wall jamb is properly
connected. 2. Seals are properly inserted.
1.
2.
Note:
The wall jamb
be kept vertical.
must
Fix wall jambs. One is fixed on the wall. The other is not fixed on the wall after the holes are drilled. Pay special
attention to both sides of the wall jamb(see magnified pictures below).
(
)
STEP
3
0mm
The wall jamb
be kept vertical.
must
0mm
6mm
Inside
Outside
Seal
Seal
Connector
Connector
Outside
Outside
Inside
Inside
1284345-T01-A