-2-
ROUGHING-IN
UNIT : mm
K-2527T
K-2529T
635
89
6
191
800
533
3
25
565
281
572
19
178
508
559
527
216
Plumbing
80
150
359
203
597
1158040-T01-A
Page 1: ...efore beginning the cabinet installation Doing so will ease the installation process Refer to the sections contained in this guide for proper removal Turn off the water supply The pluming installation...
Page 2: ...2 ROUGHING IN UNIT mm K 2527T K 2529T 635 89 6 191 800 533 3 3 25 565 281 572 19 19 178 508 19 559 527 216 19 Plumbing 635 80 150 6 572 800 3 3 359 572 19 203 25 597 178 508 559 19 19 1158040 T01 A...
Page 3: ...s must be installed with isolating valves Caution Caution Note A H C P B Install the Vanity Lift and place the vanity in position against the finished wall as shown Verify the vanity is level and plum...
Page 4: ...h the frosted side down carefully place the glass shelf on the tabs of the lower rails NOTICE CAUTION Risk of personal injury Glass Shelf C 8 4 Caulk Glass Shelf D Install Drawers Installation Risk of...
Page 5: ...e to the door with one hand to keep the door in the full open position With the other hand slide the hinge back toward you then outward away from the door Get assistance supporting the door to ease th...
Page 6: ...m of huge humidity Yet do not splash and pour water directly on the bathroom cabinet Make sure that the bathroom is not over damp and wipe any splashes from surfaces immediately 4 Maintenance of door...