-2-
ROUGHING-IN
UNIT : mm
K-97794T
Cabinet 800mm
800mm
K-97779T
Cabinet 600mm
600mm
INSTALLATION
A. Install Washbasin Cabinet
Install the services.
Hot (H) and Cold (C) inlets must be connected to the correct
inlet pipes.
Install the drain in accordance with the manufacturer's
instructions.
We suggest using P-trap drain. Connect P-trap pipe with
washbasin drain.
Make sure a watertight seal exisits on all
washbasin drain connections.
Provide access to the plumbing
connections for future plumbing maintenance.
The hot and cold water supplies must be installed
with isolating valves.
CAUTION !
CAUTION !
NOTE
A.
(H)
(C)
P
Fig.2
2
Reference Value
Kohler reserves the right to change marked dimensions without prior notice.
Fig.1
1
775
580
840
560
580
840
1244199-T01-A