
2. Install the Supply Piping
Route the water supply lines.
Use the provided soldering template to construct a pressure balancing loop.
Position tees in the loop(s) over each of the four raised locations on the template.
Solder the assembly while it is attached to the template.
IMPORTANT! For multiple supply lines:
To maintain proper alignment of the tees with the product, the
pressure balancing loops must be rigidly connected to each other while on the soldering template.
Multiple supply lines:
While on the soldering template, rigidly connect the two pressure balancing
loops to each other.
Remove the pressure balancing loop from the template.
Connect the pressure balancing loop to the water supply.
Do not strap the pipes.
Temporarily install a nipple to each tee. Do not use any sealant.
Ø 9-5/8"
(244 mm)
6-3/4"
(172 mm)
Soldering Template
6-3/4" (172 mm)
Clamp each tee
to the template
during soldering.
1/2" NPT Nipple
Soldering
Template
Pressure
Balancing
Loop
Rigidly connect
to each other.
Single Supply
Multiple Supplies
Kohler Co.
5
1235394-2-A