Kohler K-77404T-0 Installation Manual Download Page 6

-5-

C. Packing List

C.

1285547

80 Air Outlet Window
80

1285548

80 Air Exhaust Pipe
80

1285549
Clamp

2

1285550
Ventilation Outlet Assy.

Note:

Initial Length:275mm

Stretch Length: 1300mm

275mm

1300mm

BTP4 8 Triangular
Self Tapping Screw
BTP4 8

Triangular
Self-tapping Screw
BTP4*8

INSTALLATION

Caution before installation:

!

!

!

!

!

!

!

The installed product must be 200mm or above away from
curtains or other combustible materials.
The distance between the ceiling where the product is
mounted and the roof shall be 200mm or above.
Ensure that the gap between the product edge and the
wall is 300mm or above.
The power cord to the product shall have enough length
for the installation.
The distance between the product and the air outlet
window shall be 1000mm or lower.
Cut the screw rod(M6) to suit the distance between the
ceiling and the roof.
Keels should afford at least 25kg.

!

!

!

!

!

!

!

200mm

200mm

300mm

1000mm

(M6)

25kg

Air Exhaust Pipe

Wall

Lower than 1000mm

1000

300mm above
300

300mm above
300

Air Outlet Window

Bathroom Heater

1327472
Keel Lock

4

1327471
L-mounting Bracket
L

4

ST4 10 Self

Tapping Screw

ST4 10

Base

Wall Controller

1325479
Wall Controller Assy.

Frame

1322966-T01-B

Summary of Contents for K-77404T-0

Page 1: ...lation and Homeowners Guide Underscore Bathroom Heater S300 S300 K 77404T 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1322966...

Page 2: ...mplies with GB 4706 1 2005 GB4706 23 2007 and GB 4706 27 2008 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 WARNING Risk of electrical shock WARNING Risk of...

Page 3: ...ress Protection 2 2m min 3 2 2m min 3 43dB 43dB IPX2 Bathroom Heater IPX2 IPX4 Remote Control IPX4 SIMPLIFIED DIAGRAM OF THE UNIT Note Plaster or other ceiling opening dimension 275 X 275 mm 275 X 275...

Page 4: ...he insulation of power cord Copper cord must be inserted into the pillar terminal hole and make sure all the cords under the terminal are inserted into the pillar terminal completely Suggest using a p...

Page 5: ...Outlet window installation Fix the air exhaust pipe to the outlet window on the wall with the clamp as the preparation of bathroom heater installation Seal the pipe and the outlet window with foaming...

Page 6: ...the roof shall be 200mm or above Ensure that the gap between the product edge and the wall is 300mm or above The power cord to the product shall have enough length for the installation The distance be...

Page 7: ...r installation see the figures below 3 Match a keel lock with an L mounting bracket 4 Pre install the 4 matched L mounting brackets on the keel Make sure the installation clearance is appropriate The...

Page 8: ...tighten the 8 BTP4 8 triangular self tapping screws and the columnar screws 5 BTP4 8 L 6 BTP4 8 8 7 Fix the ventilation outlet assembly on the body with one BTP4 8 triangular self tapping screws Then...

Page 9: ...plates Installation finished 8 3 2 9 Power cord L N Wiring Terminal WALL CONTROLLER INSTALLATION Fix the wall controller frame and the base with two screws Then connect two signal lines with the wall...

Page 10: ...ontroller break down A Power failure D The signal line route is interrupted B Disconnected power cord A The pilot lamp does not turn on C Circuit breaker is off B Fail to control the bathroom heater A...

Page 11: ...ergent to clean casing or air louver 3 Never try to put a small screw driver or any other object into the holes of air Louver from outside This might cause damage to the interior parts and electric sh...

Page 12: ...e AC power supply should be shut off before maintaining the products with AC power related 5 All electrical connection must be compliance with related regulation and codes 6 All installation staff sho...

Reviews: