background image

1.

8mm

50mm

2.

(

6)

II

(

)

1. Mark the positions of the wall hangers on the wall

according to the dimensions shown. Drill

8mm & 50mm

deep holes and hammer the anchors in. Fix the wll hangers
onto wall with screws supplied.

2. Hang the cabinet onto wall and adjust the hanger to make

the cabinet level,as shown in Fig.6.

II Hang onto wall (installation without adjustable feet)

Fig.5

5

Fig.6

6

Cabinet Outline

Cabinet Outline

Wall Bracket

Wall Bracket

380

380

766

766

495

495

20

914

Centre

Centre

20

1220

3. Pre-drill wall anchors

Adjust cabinet level and use pencil to mark the hole of the
back bar on the wall.
Remove the cabinet, drill

8mm & 50mm deep holes at

the marked positions.
Hammer the anchors into the drilled holes.
Finish the step.

·

·

·

·

3.

8mm

50mm

·

·

·
·

-4-

B.

1.

B. Fix the cabinet onto wall

Note:

For installation with or without adjustable feet,

the cabinet must be fixed onto wall with anchors.

1. Adjust the cabinet level after installation with or without

adjustable feet. Fix the cabinet onto wall through the holes
on the back bar with anchors and gaskets supplied.

1282794-T01-A

Reviews: