1.
8mm
50mm
2.
(
6)
II
(
)
1. Mark the positions of the wall hangers on the wall
according to the dimensions shown. Drill
8mm & 50mm
deep holes and hammer the anchors in. Fix the wll hangers
onto wall with screws supplied.
2. Hang the cabinet onto wall and adjust the hanger to make
the cabinet level,as shown in Fig.6.
II Hang onto wall (installation without adjustable feet)
Fig.5
5
Fig.6
6
Cabinet Outline
Cabinet Outline
Wall Bracket
Wall Bracket
380
380
766
766
495
495
20
914
Centre
Centre
20
1220
3. Pre-drill wall anchors
Adjust cabinet level and use pencil to mark the hole of the
back bar on the wall.
Remove the cabinet, drill
8mm & 50mm deep holes at
the marked positions.
Hammer the anchors into the drilled holes.
Finish the step.
·
·
·
·
3.
8mm
50mm
·
·
·
·
-4-
B.
1.
B. Fix the cabinet onto wall
Note:
For installation with or without adjustable feet,
the cabinet must be fixed onto wall with anchors.
1. Adjust the cabinet level after installation with or without
adjustable feet. Fix the cabinet onto wall through the holes
on the back bar with anchors and gaskets supplied.
1282794-T01-A