1. Mark and Drill the Mounting Holes
Remove the wall jamb from each side panel.
Measure from the inside edge of the shower receptor and mark 35-1/2
″
(90.2 cm) (A on the
diagram) on the receptor ledge near the wall.
Place the sealing groove of the wall jamb against the wall toward the outside of the shower.
Align the inside edge of the wall jamb with the mark on the receptor ledge.
Using a level, plumb the wall jamb and mark the five wall mounting holes. Repeat for the other
wall jambs.
Drill a hole at each marked location with a 5/16
″
drill bit.
Thoroughly clean the receptor ledge and the wall.
2. Install the Adjustment Blocks
Lay the wall jamb on a flat surface.
Slide an adjustment block into each end of the channel of the wall jamb. The base of the adjustment
block should slide under the wall jamb channel lip.
Position the adjustment blocks over the end holes of the wall jambs.
To secure the adjustment block, hold the block in place and press down firmly with the screwdriver
blade to crimp the wall jamb lip.
Crimp the wall jamb channel lip on both sides of the block. Tap the screwdriver with a hammer if
necessary.
Repeat for the other wall jamb.
Pencil
A
Receptor Ledge
Outside of Shower
Mark the mounting holes
Wall Jamb
Top View
Level
Shower
Receptor
Sealing
Groove
Side Panel
Wall
Jamb
Location
Groove
Adjustment
Screw
Remove a Wall Jamb
from each side panel.
Be sure Sealing groove is
against wall toward the
outside of the shower.
Adjustment
Block
Wall Jamb
Channel Lip
Wall
Jamb
Remove a Wall Jamb
from each side panel.
1032629-2-B
4
Kohler Co.