Prepare the Site
IMPORTANT!
All drain and supply plumbing, including venting, must fit within the specified area.
NOTE:
Finished flooring surface must be installed prior to installing the base and shroud.
NOTE:
Holes for the threaded pegs will be located and drilled after the base is assembled.
Locate drain and supply piping.
10"
(25.4 cm)
24-3/8"
(61.9 cm)
24-3/8"
(61.9 cm)
7-7/8"
(20 cm)
7-7/8"
(20 cm)
19"
(48.3 cm)
58-3/4"
(149.2 cm)
34-3/4"
(88.3 cm)
Important! All plumbing and supply connections must be limited to the shaded area.
Holes in floor for
each threaded peg
1114139-2-A
4
Kohler Co.