5. Back-to-Back Valve Installation
Install both valves following the valve installation instructions.
The supplies to one of the valves will be reversed.
Remove the plaster guard, cap, cap assembly, and collar from the
valve with the reversed supply connections.
Rotate the cap assembly and collar 180° (tab on the bottom).
Reassemble and securely tighten the screws.
Reinstall the plaster guard.
This feature faces downward
for back-to-back installation.
Cold Supply 1"
Copper Tube
Hot Supply 1"
Copper Tube
180˚
Screws
Plaster Guard
Cap
Assembly
Kohler Co.
9
1012679-2-C