background image

-2-

ROUGHING-IN

UNIT : mm

TOOLS AND MATERIALS

·

·

·

·

·

·

·

·

Pencil
Measuring Tape
Level
Miter Box
Safety Glasses
Drill
Screwdrivers
Hole Saw

·

·

·

·

·

·

·

·

63

630

63

531

762

531

851

265

580

6

Kohler reserves the right to change marked dimensions without prior notice.

Reference Value

1093419-T01-B

Summary of Contents for K-2463

Page 1: ... and safety instructions All information in these instructions is based upon the latest product information available at the time of publication Kohler China reserves the right to make changes in product characteristics packaging or availability at any time without notice Ensure all electric work has completed before furniture installation Make sure the finished wall is straight and plumb and the ...

Page 2: ...D MATERIALS Pencil Measuring Tape Level Miter Box Safety Glasses Drill Screwdrivers Hole Saw 63 630 63 531 762 531 851 265 580 6 Kohler reserves the right to change marked dimensions without prior notice Reference Value 1093419 T01 B ...

Page 3: ...re a watertight seal exisits on all washbasin drain connections Provide access to the plumbing connections for future plumbing maintenance The hot and cold water supplies must be installed with isolating valves Caution Caution Note A H C P B Preparation 1 cabinet body Pull out cabinet body from carton 2 Feet Take out accessory pack and fit feet to base B 1 2 3 Door Panel left DoorPanel right Activ...

Page 4: ...er and adjust it to desired height C Door Attach 1 Line up pin with cup 2 Snap latch into base 3 Repeat for remaining hinge 4 C 1 2 3 Latch Bracket Pin Fig 3 3 Fig 4 4 Release 1 Hold door with hand 2 Release latch from bracket 3 Repeat for remaining hinge 1 2 3 Bracket Latch Fig 5 5 1093419 T01 B ...

Page 5: ...oles 2 Secure with screws 3 Attach door to hinge D 1 2 1 2 3 Top of Door Vanity Locking Screw Locking Screw Fig 7 7 Adjust 1 Adjust screws of each hinge 2 Adjust the door in height direction and depth direction Note to adjust screws only corresponding to its direction 1 2 Fig 6 6 Height Depth 1093419 T01 B ...

Page 6: ...ealant to the top of sidebo rd of washbasin cabinet and position the cabinet board with pre opened washbasin hole on the cabinet a E 1 Fig 8 8 1 2 2 Apply some sealant equably to the installing part and position the washbasin in the cabinet board 2 Fig 9 9 1 2 1093419 T01 B ...

Page 7: ...der the cabinet board with bolts Caution 1 2 Sealant Clamp Clamp Note Do not tighten the bolts completely at the first time Adjust the washbasin position to the center of the pre opened hole and tighten the bolts completely 3 Apply some sealant equably as bead to the washbasin edge tangent to cabinet board 3 Fig 11 11 Fixed Cabinet Board 1 Use cabinet board linkers to connect the cabinet board and...

Page 8: ... 1 P Connect Drainage 1 Inwall drainage P Trap Please install the drain assembly and faucet as shown Please set the water supply and drainage position according to the suppliers instructions You can adjust the height of shelf to fit the drain assembly 1093419 T01 B ...

Page 9: ...d performance even in bathroom of huge humidity Yet do not splash and pour water directly on the bathroom cabinet Make sure that the bathroom is not over damp and wipe any splashes from surfaces immediately 4 Maintenance of door board Clean and wipe door board regularly and wipe the condensation vapor with dry and soft cloth 5 Ensure that electrical connections for appliances such as head lamp is ...

Reviews: