4. Installing the Main Body Method 2 Ceiling mounting has
not been installed.
(1) Positioning and installation of the suspenders
1) Put the installation template to the position of fixed
hole A and B on where the bathroom heater is going
to be installed.
4.
(1)
1)
A
B
Install Template
Cement Board
2) According to the marked positions of screw rods, fix
the rods on the ceiling.
2)
Cement Board
Suspender
-9-
(2) Fix the ventilation outlet assy. to the main body using
the BTP4*8 self-tapping screw.
(3) Fix the suspension bracket to the main body using the 8
BTP4*8 self-tapping screws.
(2)
1
BTP4*8
(3)
8
BTP4*8
BTP4*8 Self Tapping Screw
BTP4*8
(1
)
BTP4*8 Triangular
Self Tapping Screw
BTP4*8
(4
)
(4) Fix the product on the M6 suspender by the suspension
bracket. Lock the nut after the installation.
(4)
M6 Butterfly Nut
M6
6 Washer
6
6 Spring Washer
6
M6 Nut
M6
Fixed Hole A
A
Fixed Hole B
B
1374353-T01-A