-10-
(6) After the bathroom heater is fully inserted into the hole.
Fix the hanger with the heater by using 8 BTP 4*8
triangular self-tapping screws. Finally, put back the
decorative screw covers.
(6)
BTP4*8
(8pcs)
(
)
(5pcs)
(
)
Decorative
Screw Cover
Plasterboard
Ceiling
Plasterboard
Panel Base
Panel Base Clinging to Plasterboard
BTP4*8 Triangular
Self-tapping Screw
BTP4*8
2. Installing the Main Body Method 2 Ceiling mounting has
not been installed.
(1) Positioning and installation of the suspenders
1) Mark the holes of screw rods on the cement board as
the figure shows.
2.
(1)
1)
90
180
°
°
Install Template
Cement Board
Marked Hole
Marked Hole
Marked Hole
Center Line
1374352-T01-D