* BONNET IS PUSH FIT
INSTALLATION - SPOUT ASSEMBLY
1216567-IN2-C
2
INSTALLATION - HANDLE ASSEMBLY
1216567-IN2-C
3
8b
9
10
7b
1
2
3
4
5
6
WALL
PROTECTIVE COVER
COVER PLATE
PROTECTIVE COVER REMOVAL
CONNECTOR ASSEMBLY
COVER PLATE ASSEMBLY
O-RING
SPOUT ASSEMBLY
SPOUT PRESS AGAINST WALL & TIGHT SET SCREW
SPOUT
SET SCREW
HEX WRENCH
INSTALLED VALVE ASSEMBLY
7a
PLUG
HANDLE
SET SCREW
1
2
3
4
HANDLE
BONNET
5684IN-4ND-**
RING
SCREW
HEX WRENCH
BONNET
HANDLE
1
2
3
4
8a
O-RING
1. CONNCTOR FACE TO BE
FLUSH WITH VALVE FOR
SEALING
* ONCE FLUSHING IS OVER, PUT THE HANDLE DOWN
& HAND TIGHT THE AERATOR
COLD
HOT
2. AFTER MOUNTING CHECK
FOR LEAKAGE
ALL TRIMS EXCEPT
5684IN-4ND-**
* OPEN THE HANDLE & SWIVEL LEFT & RIGHT TO
FLUSH THE DEBRIS OUT
* REMOVE THE AERATOR
* LIFT THE HANDLE & TIGHT THE
SCREW
OPENING
TIGHTENING