background image

* BONNET IS PUSH FIT

INSTALLATION - SPOUT ASSEMBLY

1216567-IN2-C

2

INSTALLATION - HANDLE ASSEMBLY

1216567-IN2-C

3

8b

9

10

7b

1

2

3

4

5

6

WALL

PROTECTIVE COVER

COVER PLATE

PROTECTIVE COVER REMOVAL

CONNECTOR ASSEMBLY

COVER PLATE ASSEMBLY

O-RING

SPOUT ASSEMBLY

SPOUT PRESS AGAINST WALL & TIGHT SET SCREW

SPOUT

SET SCREW

HEX WRENCH

INSTALLED VALVE ASSEMBLY

7a

PLUG

HANDLE 

SET SCREW

1

2

3

4

HANDLE

BONNET

5684IN-4ND-**

RING

SCREW

HEX WRENCH

BONNET

HANDLE

1

2

3

4

8a

O-RING

1. CONNCTOR FACE TO BE 

    FLUSH WITH VALVE FOR

SEALING

* ONCE FLUSHING IS OVER, PUT THE HANDLE DOWN

& HAND TIGHT THE AERATOR

COLD

HOT

2. AFTER MOUNTING CHECK

    FOR LEAKAGE 

ALL TRIMS EXCEPT

5684IN-4ND-**

* OPEN THE HANDLE & SWIVEL LEFT & RIGHT TO

  FLUSH THE DEBRIS OUT

* REMOVE THE AERATOR

* LIFT THE HANDLE & TIGHT THE 

SCREW

OPENING

TIGHTENING

Reviews: