1265601-2A-A
2
1265601-2A-A
3
INSTALLATION CHECKOUT
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft
cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. which could adversely
affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler faucets and fittings.
6
7
12
8-2
14
6
7
12
8-1
14
13
16
15
10
11
9
INSTALLATION
How to Install the Faucet
To perform installation, installer must provide G1/2
˝
female supply
fittings(1), spaced 150mm apart and horizontally. The supply fittings
should be vertical and not beyond the finished wall. Hot supply pipe
must be located on the left.
Flush the water supply pipes thoroughly to remove debris.
Install the two offset connectors(2) into the hot and cold supply pipes.
Use appropriate thread sealants or thread tape on pipe threads.
Adjust the center-to-center distance between the connectors to 150mm
and horizontally. Thread the escutcheons(3) onto the connectors until
they are against the finished wall.
Put the washers(4) into the nuts(5), thread the nuts to connectors.
Tighten the nuts with strap wrench or soft cloth between product and
regular wrench.
How to Install the Column
Select a location in vertical wall to install shower column according to
rough-in dimensions.
Drill the lower hole as anchors(6) diameter and lower base(8-1) position
in the finished wall(
NOTE:
The arrow in the base is upward). Press
anchors into the hole, secure the base by the screw(7).
Rehearse the slide bar kit(9) installation for the upper base(8-2) mounting
location determination. Slide the tube joint(10) onto the slide bar kit, and
connect them to the base(
NOTE:
The arrow in the base is upward).
Install the screws(12) into the tube joint with the hex wrench(11), and
tighten them.
Place the slide bar and the body against the finished wall. Connect the
lower base and the diverter body kit(13). Position and tighten them by
hex wrench. Mark the hole of upper base(8-2) with a pencil. Uninstall the
slide bar kit and tube joint.(
NOTE:
Don’t lose the screws.)
Drill holes on the mark. Press the anchors into the holes. Secure the
upper base(8-2) by the screws. Install the tube joint(10) to the base(8-2)
and tighten them by screws. Reinstall the slide bar kit with escutcheons
(14) to the bases. Tighten the screws with the hex wrench. Screw the
escutcheons with the bases until against the finished wall.
Install the tube kit(15) into the slide bar kit. Install the nut(16) onto the
tube kit with soft cloth between internal hole of the nut and the tube kit.
Then screw the nut onto the slide bar kit with strap wrench or soft cloth
between the nut and regular wrench.
How to Install the Handspray and the Hose
Before install handspray(17), turn the diverter handle(18) right to close
the wall and run hot and cold water for about one minute to remove any
debris.
Put the check valve(19) into the handspray inlet if needed. Connect the
hose(20) to the handspray, and to the connector(22) with the
washers(21). Connect the hose(23) to the faucet outlet(25), and to the
connector(26) with the washers(24).
How to Install the Showerhead
Before install showerhead(27), turn the diverter handle vertically to the
wall and run hot and cold water for about one minute to remove any
debris.
Install the restrictor(28) if needed. Take out the washer(29) and install the
restrictor as shown, reinstall the washer. Tighten the showerhead onto
the tube outlet with strap wrench.
4
5
2
Hot
Cold
1
3
150mm
29mm
Hot
Cold
21
19
17
20
25
24
26
18
21
22
24
23
30
Ensure that all connections are tight. Ensure that the handle is in the off
position.
Turn on the drain and main water supply, and check for leaks. Repair as
needed.
Remove the aerator(30). Turn on the faucet. Run hot and cold water
through the spout for about one minute to remove any debris. Check for
leaks. Remove any debris from the aerator. Shut off the faucet. Reinstall
the aerator.
27
29
28