PLANNING AND INSTALLATION 

 
All  shower  receptors  should  be  supported  from  the  underside  with  mortar  or  grout.  Ensure  that  drain  plumbing  does  not 
protrude too far above the building floor and that there are no objects such as large aggregate between the building floor and 
the  shower  bottom  which  would  result  in  upwards  pressure  against  the  floor. 

Any  upwards  pressure  on  the  floor  could 

cause the floor to crown and water to pool, voiding the warranty. 

 

WARNING: Make sure a watertight seal exists on all shower receptor drain connections (flange, gasket and thread).  

 

1.  Prepare the framing pocket to suit the appropriate receptor outside dimensions as shown in the table of dimensions. 
2.  When  a  fire-rated  wall  is  specified,  the  finished  fire-rated  wallboards  should  be  in  place  prior  to  installation  of  the 

unit (NOTE: In this case, allowance must be made for the thickness of the wall board when constructing the framing 
pocket.)  

3.  Locate correct position for drain and trap and cut out floor, leaving clearance for final positioning and hook up. 
4.  Measure from the bottom of the apron to the top of the flange at the front of the receptor. 
5.  Scribe a line at this height on the studs or drywall at both ends and along the back wall of the framing pocket. This 

line should assist in levelling the receptor. 

6.  Attach drain fitting to receptor. As mentioned above, please ensure a watertight seal. 
7.  Slide  receptor  into  position,  check  for  level  at  both  ends  and  along  the  back  wall  and  adjust  as  necessary.  Hytec 

recommends the use of a digital or precision level. 

IMPORTANT NOTE: For proper drainage, the maximum allowed tolerance for leveling is 1/8

” over the length 

and width of the unit.  
 

      

 

 

8.  In wood frame or steel stud construction, Hytec tubs and showers are all designed to rest on their front apron and 

be supported by the nailing flanges along both sides and back. The flanges are attached by screws or nails to the 
studs  that  form  the  framing  pocket

It  is  a  requirement  that  the  shower  receptors  are  supported  from  below 

using  grout  or  mortar  mix.  Please  see  the 

“Application  of  Grout  or  Mortar”  section  for  additional 

information. 

9.  Once satisfied with location, mark and drill clearance holes in the nailing flange for mounting screws, lining up with 

the centre of all wall studs. NOTE: failure to drill clearance holes may result in stress cracks in the acrylic finish. 

10.  Attach  the  unit  with  screws  at  each  stud,  making  sure  that  the  screws  are  long  enough  to  penetrate  the  studs  if 

installing over previously installed drywall or fire-rated wall coverings. 

 

Application of Grout or Mortar. 

 

Measure  the  distance  between  one  of  the  corners  of  the  shower  well  and  the  center  (

“X” in the drawings below). 

Mark the middle point of this distance (

“X/2” in the drawings); this will be the location of the grout/mortar mix.  

Repeat and mark the spot for the other 3 corners of the shower well. 

Mix  the  material  with  water  in  4  Ziploc  sandwich  bags.  Make  sure  that  you  have  enough  grout  to  support  the 
receptor on  each  spot  (close  the  gap between  the  floor  and  the  unit).  Please see  the  instructions  provided by  the 
supplier to find the recommended mix ratios. 

Place the 4 Ziploc bags with mortar mix (you can keep it inside the bags),

 

and re-check the level at both ends and 

along the back wall.  

Let the mortar/grout cure. 

 

Application of Grout/Mortar: 

 
 Center Drain (view from below) 

 

 

                    Right Hand Drain (view from below) 

 

 
 
 
 
 
 
 
 

 

Summary of Contents for HYTEC ACR3769/LT

Page 1: ...R3777 42 1067mm 34 864mm 21 533mm 17 432mm 5 7 8 149mm 4 3 8 111mm ACR3778 LT 48 1219mm 34 864mm 24 610mm 17 432mm 5 7 8 4 149mm 114mm 4 3 8 3 111mm 76mm ACR3778L R LTL R 48 1219mm 34 864mm 9 229mm 16 1 2 419mm 5 7 8 4 149mm 114mm 4 3 8 3 111mm 76mm ACR3778DTA B 48 1219mm 34 864mm 24 610mm 17 432mm 4 1 4 108mm 2 3 4 70mm ACR3779 54 1372mm 34 864mm 27 686mm 17 432mm 5 7 8 149mm 4 3 8 111mm ACR3780 ...

Page 2: ...4mm 30 813mm 9 1 4 235mm 14 1 2 368mm 3 3 4 95 25mm 2 5 63 5mm ACR20037 60 1524mm 32 813mm 30 762mm 16 406mm 3 3 4 95 25mm 2 5 63 5mm ACR20038 60 1524mm 34 864mm 30 762mm 17 432mm 3 3 4 95 25mm 2 5 63 5mm ACR20039 60 1524mm 36 914mm 30 762mm 18 457mm 3 3 4 95 25mm 2 5 63 5mm ACR20144 36 914mm 47 3 4 1213mm 18 457mm 23 3 4 603mm 5 7 8 149mm 4 3 8 111mm ACR20445L R 54 1372mm 42 1067mm 9 241mm 21 533...

Page 3: ... drainage the maximum allowed tolerance for leveling is 1 8 over the length and width of the unit 8 In wood frame or steel stud construction Hytec tubs and showers are all designed to rest on their front apron and be supported by the nailing flanges along both sides and back The flanges are attached by screws or nails to the studs that form the framing pocket It is a requirement that the shower re...

Page 4: ...good quality car or boat wax to protect the gloss and make cleaning easier Stains For stubborn stains start with a liquid detergent if this does not work try a mild powder detergent such as Spic and Span which also works well for removing heavy soap film Cleaning pads made of nylon saran or polyethylene and containing no abrasives may be used Do not use abrasive scouring powders or metal scouring ...

Page 5: ... steam generators HYTEC S LIMITED WARRANTY OBLIGATIONS ARE EXPRESSLY LIMITED TO THOSE SET FORTH HEREIN AND ARE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED THE LIABILITY OF HYTEC TO THE BUYER WITH RESPECT TO THE SALE OF A UNIT SHALL BE LIMITED TO REPAIR OR REPLACEMENT AS PROVIDED HEREIN TO A MAXIMUM OF THE PURCHASE PRICE OF THE RELEVANT UNIT AND DOES NOT INCLUDE ANY COST OF REMOVAL OR REIN...

Reviews: