-21-
10.
Remove
discharge
valve
as
shown
and
then
take
valve
out
for
cleaning
or
adjusting.
10.
Outlet
Valve
Outlet
Valve
Floating
Box
Drainage
valve
Adjustment
Switch
B.
Adjust
Drainage
Valve
Drainage
volume
and
overflow
level
of
the
tank
can
be
adjusted
by
drainage
valve:1)
heavy
drainage
adjustment:
open
adjustment
switch
to
open
the
small
hole.
2)
slight
drainage
adjustment:
adjust
the
height
of
floating
box
and
the
water
level
of
slight
drainage
will
be
at
the
bottom
of
the
floating
box.
B.
(1)
(2)
A
.
Wash
Filtration
Net
Close
corner
valve
first,
then
loosen
and
take
out
the
tighten
nut,
and
wash
the
waste
on
filtration
net
with
clean
water.
Then
reset
the
tighten
nut
to
the
original
position.
A.
Tighten
Close
Open
Corner
Open
A
Tighten
Close
C
Filtration
Net
B
Press
for
Top
1288818-T01-A
Summary of Contents for HYDRO-TOWER 200 K-20006K-PNE
Page 23: ...A B A B 23 1288818 T01 A ...