4. INSTALLATION
[g, i����
PRECAUTIONS IN INSTALLATION
��)±��I.tl1
&
PRECAUTIONS IN INSTALLATION:
• It is recommended to have a professional install • iltt"afl�iSl��.ft.A.�l1!Jr�� ;
this product.
• Check for missing parts before installation.
• This product should not be installed outdoors.
Keep it far away from UV, heat, fuel and
chemicals.When the ambient temperature is
below 5
°
C; protective measures should be taken
to prevent the filter from cracking.
• ���?±�ifu'$M���g�ftj:�a:tr�iE� ;
• �f=fifi�'.§.��f'.±�9� , �iiJ����9�tlt
�;mt 1-'f&;S:JJ:.J.&�Mif-t�fifl�. �tf�;Uf�
':fS°CB..t, JllZX1�lfflH�f�ftl'l:\'MB, �:.llln)1f�;
• Keep the direction of water flow in the pipe in line • ��B1Ji1ZH@c:p�7./<iID:ffi:iJ!§'��H-tJiJi't.ir
i.r-�m'�JJfi:iJ-� ;
with that of the arrow marked on the filter.
• Before connecting the inlet pipe,please remove
residual impurities and dust in it. Then close the
main valve before connecting the system.
• H���Jtt7.l<�mr , u���c:p�ffi���-
1x� , ?tl§��,�-�;Jcl;{I , MU��� ;
• Pay attention to height and angles when connecting •
pipes Stress on the pipes must be low to avoid
damage to them after a long period of use.
Otherwise, penetration of the device or pipeline
�@m-\B1Jl!}i��JJtf
□
J=IJn!:n.JJJt , �B
,\J§�m�fff'.f:Bfa.l.lm.�Ji1Zt.JJ:.J.��WIHB1 , EB
':F�@�JilZt.JUlt�m�,������
�)ffi;
may occur.
• Wind the
PTFE
tape fully and evenly.
• When tightening a hex nut with the wrench,make
sure that the other parts do not rotate with it.
• After installation is complete, carefully observe
whether there is leakage or seepage.
Unless noted otherwise, all installation, maintenance
and operation diagrams of this guide take PF040 as
examples. Diagrams are for reference only, please
refer to the actual product.
• tt���:W\'W�B1f� , \w,�JtS����� ;
• mJ=.&¥rr�1'n.J!kl�il�B1fl*�"{�!etft!lil'�S
�lli���;
• ��J§H�x!.lltll:�:S�lffi7.l<��lffiml� ;
GETTING STARTED
��,i�
1, Determining Installation Site
Q). A floor drain or drain line must be installed within
1.5m of the installation site. Keep the drain outlet
unblocked.
®·
Prepare a 220V/50HZ power supply and a
two-hole electric outlet within 1.5m of the
installation site. The power supply and electric
outlet should be installed more than 500mm
above the ground, equipped with power leakage
protection and waterproofing devices.
@. Keep water pipes more than 525mm above the
ground,and more than 120mm away from the
wall to reserve space for maintenance, as shown
in Figure 1.
1350522-T01-A
-7-
1 , ��fSffi®�
Q). ��fSffi 1.sm 5'BIIl�Ji1Zffl�:lt!l;ffi�t:j�;'5� ,
.fil.l���im.
®· ��ifil![ 1.5m 5'BIIl�Ji1Zffi� 220V/50HZitl�
7.il 2 :rLitl;ffijffi� , l'il'.IB1f=�itl;ffiruffi��mz�
��«e±!Bim500mm�:.l...t,'tf-llia*lffiitlf�Pf
□
lln7.l<H.
®· 7.l<�«e�:lt!lim > 525mm , «e�J:1/ij� > 120mm
Eliffi���f§J �
□�
1 fmr-;
Summary of Contents for GEOG K-21727T-PF040-Q73
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 8: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......