A. Locate the bath in the proposed position
BEFORE INSTALLING UNIT
A. Protect the Bath Unit
Position a protective covering underneath the bath and be careful not to scratch the bath surface.
3
1)
SITE REQUIREMENTS
A.
Preparation
Check the flooring under the bath, and make repairs as necessary. Make sure the subfloor is level. It is strongly
recommended to prepare a waterproof layer for the subfloor beforehand. It may be necessary to plan for a
Subfloor
INSTALLATION
5mm
Finished floor
Adjust this nut to lock / unlock the
adjustable feet.
Adjust the height of the bath
by tightening this nut.
With the bath in position, adjust the bath feet such that the bath is level and the base of the bath is
5mm from the finished floor.
channel in the floor to allow space for a trap, see cross section of the Evok bath and waste below:
42mm