A. Locate the bath in the proposed position

BEFORE INSTALLING UNIT

A. Protect the Bath Unit

Position a protective covering underneath the bath and be careful not to scratch the bath surface.  

3

 

1) 

SITE REQUIREMENTS

A.

Preparation

Check the flooring under the bath, and make repairs as necessary. Make sure the subfloor is level. It is strongly

recommended to prepare a waterproof layer for the subfloor beforehand.  It may be necessary to plan for a 

 

Subfloor

INSTALLATION 

5mm

Finished floor

Adjust this nut to lock / unlock the 

adjustable feet.

Adjust the height of the bath

by tightening this nut.

With the bath in position, adjust the bath feet such that the bath is level and the base of the bath is 

5mm from the finished floor.  

channel in the floor to allow space for a trap, see cross section of the Evok bath and waste below: 

42mm