
-8-
Finish the Installation
1. Fit the handles to vanity top cabinet, vanity basin unit,
undermounted unit and pedestal unit.
2. Place the handle on the front of the unit, and secure in
place using two screws.
1.
2.
3.
4.
5.
6.
7.
3. Fit the tap to the basin in accordance with the
manufacturer
,
s instructions.
4. Connect the hot and cold water supplies.
5. Attach the waste, and tighten securely.
6. Open the hot and cold water valves, and check the supply
connections for leaks.
7. Run water into the basin, and check the drain connections
for leaks.
HOT
COLD
1038407-T01-D