Kohler ENGLEFIELD MILANO FS Installation Instructions Download Page 4

Page 3

INSTALLATION INSTRUCTIONS

ENGLEFIELD

CONTACT AND WARRANTY INFORMATION

NEW ZEALAND 

KOHLER NZ LTD

Free Ph:  0800 100 382
Free Fax: 0800 664 488

www.englefield.co.nz

AUSTRALIA 

KOHLER CO.

Free Ph:  1 800 ENGLEFIELD
               (1 800 364 533)

www.englefield.com

1)   Please refer to the Homeowner’s Guide for cleaning instructions.

2)   Because baths are often placed on cold floors, and Solid surface baths are sensitive

      to thermal shock, it is highly recommende in cold periods, to run in lukewarm water for 

      a couple of minutes before running hot water.  It is recommended the hot water be no 

      more than 60 C.

For warranty information, please visit our website.

CLEANING AND MAINTENANCE INSTRUCTIONS

Installation complete.

 

      

    

    

 MILANO  Solid Surface FS Baths

TM

5)   Carefully slide the timber blocks out and gently lower the bath into place.  Apply an 

      appropriate silicone sealant, ensuring a watertight seal between the bath and adjacent

      surfaces. 

3)   Light scratches can be removed, if necessary, with very fine sandpaper.  It is 

      recommended to start with 1200 grade followed by 2500 grade.  Finally use car cutting 

      compound to polish the area to recover the gloss surface.

Summary of Contents for ENGLEFIELD MILANO FS

Page 1: ... the very best it can be ROUGH IN DIMENSIONS NOTE Check the rough in and room dimensions to provide adequate available space for the bath unit Arrange the location of the drain in advance and ensure that the flooring is prepared to allow space for the drain Ensure that the floor is level 800 1700 540 1146 542 TM WARNING The Milano Solid Surface Freestanding bath is very heavy Please make sure that...

Page 2: ...Solid Surface FS bath and report any damage to us Installers are responsible for damage that occurs during installation and no claims for damages will be accepted once the bath has been installed INSTALLATION INSTRUCTIONS MILANO Solid Surface FS Baths BEFORE YOU BEGIN TOOLS AND MATERIALS REQUIRED ENGLEFIELD CONCRETE SLAB FLOOR PREPARATION IF APPLICABLE Note Instructions drawings and diagrams conta...

Page 3: ...S 3500 plumbing standard INSTALLATION 3 Connect the waste outlet to the drain Check to see that all connections are firmly tightened 4 Close off the waste and fill the bath with water allow the water to stand for at least 30 minutes check for leaks Attend to waste and pipe connections as necessary 2 Raise the Free Standing bath off the floor by propping it up onto timber blocks positioned at eithe...

Page 4: ...in lukewarm water for a couple of minutes before running hot water It is recommended the hot water be no more than 60 C For warranty information please visit our website CLEANING AND MAINTENANCE INSTRUCTIONS Installation complete MILANO Solid Surface FS Baths TM 5 Carefully slide the timber blocks out and gently lower the bath into place Apply an appropriate silicone sealant ensuring a watertight ...

Reviews: