3
Kohler Co., Kohler, WI
110282-2-
AA
(9515)
3. INSTALLATION
INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to the instructions packed
with the supply stop.
Locate the supply shut-off valve so it is 7-1/4” above the
floorline, and 4-1/8” to the left of the centerline of the
closet flange.
Fig. #2
4-1/8”
7-1/4”
12”
Install new 5/16” diameter T-bolts.
Fig. #3
Closet Flange
T-Bolts
INSTALL TOILET GASKET
Position the toilet upside down on padding.
Firmly attach the gasket around the toilet outlet. If you are
using a gasket with an integral plastic sleeve, position the
gasket with the sleeve facing away from the toilet.
If desired, apply a 1/4”-thick bead of toilet setting
compound around the toilet base.
NOTE: If a rag or other plug was placed in the closet
flange, remove the rag before setting the toilet.
Fig. #4
Gasket
ALIGN AND SET TOILET
Carefully align and lower the toilet over the closet flange
and T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock the toilet after placement. A new gasket must
be reapplied if you break the watertight seal.
Apply full body weight to the toilet rim to set the seal.
Fig. #5
SECURE TOILET
Assemble the bolt cap bases, washers, and nuts on the
exposed T-bolts.
CAUTION: Risk of personal injury or product
damage. Overtightening may cause breakage or
chipping.
Hand tighten the nuts, then tighten them an additional
1/2-turn with a wrench. If the T-bolts extend more than
1/4” from the top of the nut, cut off the excess with a
hacksaw, and file the cut edges. Wipe away any residue.
Install the bolt caps.
Fig. #6
Bolt Cap Base
Washer
Nut
Bolt Cap