Lubrication System
87
24 690 02 Rev. H
KohlerEngines.com
7. Reinstall
oil
fi
ll cap/dipstick and tighten securely.
8. Start engine; check for oil leaks. Stop engine; correct
leaks. Recheck oil level.
9. Dispose of used oil and
fi
lter in accordance with
local ordinances.
OIL COOLER (if equipped)
1. Clean
fi
ns with a brush or compressed air.
2. Remove screws securing oil cooler and tilt to clean
back side.
3. Reinstall oil cooler and torque to 2.2 N·m (20 in. lb.).
OIL SENTRY
™
(if equipped)
This switch is designed to prevent engine from starting
in a low oil or no oil condition. Oil Sentry
™
may not shut
down a running engine before damage occurs. In some
applications this switch may activate a warning signal.
Read your equipment manuals for more information.
Oil Sentry
™
pressure switch is installed in breather cover.
On engines not equipped with Oil Sentry
™
installation
hole is sealed with a 1/8-27 N.P.T.F. pipe plug.
Installation
1. Apply pipe sealant with Te
fl
on
®
(Loctite
®
PST
®
592™
Thread Sealant or equivalent) to threads of switch.
2. Install switch into tapped hole in breather cover.
3. Torque switch to 4.5 N·m (40 in. lb.).
Testing
Compressed air, a pressure regulator, pressure gauge,
and a continuity tester are required to test switch.
ECV Models:
Normally Closed Switch
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate continuity (switch
closed).
2. Gradually increase pressure to switch. As pressure
increases through range of 2.0/5.0 psi, tester should
indicate a change to no continuity (switch open).
Switch should remain open as pressure is increased
to 90 psi maximum.
3. Gradually decrease pressure through range of
2.0/5.0 psi. Tester should indicate a change to
continuity (switch closed) down to 0 psi.
4. Replace switch if it does not operate as speci
fi
ed.
Normally Open Switch
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate no continuity (switch
open).
2. Gradually increase pressure to switch. As pressure
increases through range of 2.0/5.0 psi, tester should
indicate a change to continuity (switch closed).
Switch should remain closed as pressure is
increased to 90 psi maximum.
3. Gradually decrease pressure through range of
2.0/5.0 psi. Tester should indicate a change to no
continuity (switch open) down to 0 psi.
CV Models:
Pressure Switch
PSI
12 099 04
2-6
24 099 03
2-5
25 099 27
2-5
28 099 01
2-6
48 099 07
12-16
52 099 08
7-11
52 099 09
7-11
Summary of Contents for Command PRO CV26
Page 64: ...EFI SYSTEM BOSCH 64 24 690 02 Rev H KohlerEngines com ...
Page 66: ...EFI SYSTEM BOSCH 66 24 690 02 Rev H KohlerEngines com ...
Page 77: ...77 EFI SYSTEM BOSCH 24 690 02 Rev H KohlerEngines com ...
Page 132: ... 2014 by Kohler Co All rights reserved 132 24 690 02 Rev H KohlerEngines com ...