1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Use lag bolts (not provided) to install the hanger to the wall
according to the roughing-in information. Make sure the hanger is
level, and is secured to the backing material behind the finished
wall.
Apply four self-adhesive gaskets (provided) to the top edge of the
pedestal as shown in “Install the Lavatory”.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on
the floor centerline location at the required distance from the
finished wall.
Kohler Co.
3
1015595-2-A