Kohler BEITOU 72830T-L Installation Instructions Download Page 2

   

                                                                          

     1227406-2A-E            

                                                                                                                                        2  

  

   

                                                                          

     1227406-2A-E          

                                                                                                                                          3

  

INSTALLATION CHECKOUT

Ensure that all connections are tight. Ensure that the handle is in the off position. 

Turn on the drain and main water supply, and check for leaks. Repair as needed.

CLEANING INSTRUCTIONS

All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft 

cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc, which could 

adversely affect the finish and are not recommended for cleaning.

Do not use abrasive cleaners or solvents on Kohler faucets and fittings. 

9

11

10 12

7

8

INSTALLATION

How to Install the Base 

Determine the position of the base(1) will be mounted on the vertical wall according to the rough-in dimensions. 

Make a suitable hole in the wall. Drill four holes(Ø10) as anchor(3) diameter and base position in the wall. The 

center line of two vertical holes should be vertical. 

Install the anchors, secure the base by the screws(2). 

NOTE:

 The out surface of the finished wall should be 

between the MAX and MIN marks on the protector(4). Ensure the bottom of protector is horizontal by lever ruler.

Use appropriate thread sealants or thread tape on the 

water supplies(5).  Connect water supplies to the base. 

During installation, the protector remain on the base.

How to Install the Showerhead

When the finished wall is completed, take off the screws(6) and protector(4). The angle between connectors(7) 

and finished wall should be 93 degrees. 

Remove the connectors(7) by hex wrench, take off 

the filter washers(8). Flush water supplies for about 

one minute to remove debris. Reinstall the           

connectors and filter washers.

Slide the escutcheon base(9) on the connector till it 

against the wall, tighten it by screw(12) with 

washer(11) and locking gasket(10).

Slide the showerhead kit(16) into the 

escutcheon base. 

Fix the showerhead by the screw(15) 

with washer(11, 13) and locking 

gasket(10). Press the cap(14).

Level ruler

Level ruler

Rain

Waterfall

Laminar

2

3

1

1

7

4

4

4

93º

93º

7

4

6

5

16

13

10

15

14

11

Reviews: