background image

Kohler Co. 

1374323-X2-A

UNIT:mm

หน่วย: มม.

1. Mark the position of hanged bracket according to dimension 

as illustrated, and loosen the suspension hook of washba-

sin cabinet.

CAUTION: 

Avoid the cables and pipes inner set when 

drilling in the wall.

Note:

 Different types of bolts are required for different decora-

tion boards. Please apply suitable bolts and plugs.

2. Drill holes for fixing the bracket. Using a level, ensure that 

the hanged bracket is level.

3. Use suitable plugs and bolts, and fix the hanged bracket on 

the wall.

4. Hang the washbasin cabinet on the wall, and position the 

suspension on the hanged bracket. See Fig.4.

Fig.3

รูปที� �

Wall Bracket

All installation dimensions are for reference only.

20

355

414

355

20

538

175

1164

ขอแขวนผนัง

ระยะการติดตั�งใช้สําหรับการอ้างอิงเท่านั�น

Fig.4

รูปที� �

1. เลือกต�าแหน่งที่จะติดตั้งของแผงยึดแขวนตามระยะการติดตั้งดังภาพที่

แสดงและคลายตัวรองกันกระแทกของตู้เฟอร์นิเจอร์

ข้อควรระวัง:

 เมื่อเจาะรูบนผนัง ระมัดระวังอย่าให้โดนสายไฟหรือ

ท่อน้�าประปา

หมายเหตุ:

 เลือกใช้โบลท์และพุกให้เหมาะสมกับการติดตั้ง

2. เจาะรูบนผนังส�าหรับติดตั้งแผงยึด จากนั้นประกอบแผงยึดเข้ากับผนัง 

ตรวจสอบให้แน่ใจว่าแผงยึดได้ระดับ

3. ยึดแผงยึดไว้กับผนัง โดยใช้โบลท์และพุกขนาดเหมาะสม

4. แขวนตู้เฟอร์นิเจอร์กับผนัง และจัดต�าแหน่งตัวรองกันกระแทกดูรูปที่ 4

Summary of Contents for ALEUTIAN K-24203X

Page 1: ...e pluming installation must comply with Water Supply Regulations Bye laws Building Regulations or any particular regulations and practices specified by the local water company or water undertakers The...

Page 2: ...all the drain in accordance with the menufacturer s instructions We suggest using P trap Drain Connect P trap pipe with Vanity drain CAUTION Make sure a watertight seal existing on all Vanity CAUTION...

Page 3: ...are required for different decora tion boards Please apply suitable bolts and plugs 2 Drill holes for fixing the bracket Using a level ensure that the hanged bracket is level 3 Use suitable plugs and...

Page 4: ...inner set when drilling in the wall Note Different types of bolts are required for different decoration boards Please apply suitable bolts and plugs 8 Insert the plugs into the wall 9 Take out the mid...

Page 5: ...op Note Please refer to the installation instructions of synthetic top for its installation To protect the cabinet from dampness please apply silicone sealant where the synthetic top and the cabinet c...

Page 6: ...trict procedures for damp proof whose good damp proof function ensures good performance even in bathroom of huge humidity Yet do not splash and pour water directly on thebathroom cabinet Make sure tha...

Page 7: ...Kohler Co 7 1374323 X2 A...

Page 8: ...th FL JasmineCityBldg 2 Soi Sukhumvit23 Sukhumvit Road Wattana Bangkok10110Thailand Call Center Tel 66 2700 9299 Fax 66 22046224 ASIAN EMERGING MARKETS Asia Customer Service Centre Kohler Asia Pacific...

Reviews: