1270403-2A-C
2
1270403-2A-C
3
INSTALLATION
How to Install the Faucet
To perform installation, installer must provide G1/2
˝
female supply fittings,
spaced 150mm apart and horizontally. The supply fittings should be
vertical and not beyond the finished wall. Hot supply pipe must be located
on the left.
Flush the water supply pipes thoroughly to remove debris.
Use appropriate thread sealants or thread tape on the threads of offset
connectors(1). Install two offset connectors into hot and cold supply pipes.
Adjust the center-to-center distance between the connectors to 150mm
and horizontally. They should extend 33 to 43mm beyond the finished
wall. Put the washers(2) into supply nuts(3) of the faucet. Apply a ring of
putty on back of the escutcheons(4). Install the escutcheons onto the
supply nuts. Thread the supply nuts onto the connectors and tighten by
strap wrench.
Push the escutcheons until against the finished wall. Remove any excess
putty.
How to Install the Handshower and Hose
Turn the diverter handle(19) for handshower(18) and run hot and cold
water for about one minute to remove any debris before the handshower
is installed.
Put the restrictor(20) into the handshower inlet if needed. Connect the
hose(21) to connector(23) and handshower with washers(22).
Hang the handshower on the shower bracket(24).
How to Install the Showerhead
Turn the diverter handle for showerhead(25) and run hot and cold water
for about one minute to remove any debris before the showerhead is
installed.
Before installation, put the restrictor(26) into the showerhead inlet if
needed. Take out the washer(27) and install the restrictor as shown,
reinstall the washer. Tighten the showerhead onto the tube kit outlet(28)
with strap wrench.
INSTALLATION CHECKOUT
Ensure that all coupling nuts are tight. Close the valves. Turn on the main water supply, and check for leaks. Repair
as needed.
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft
cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. which could adversely
affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler faucets and fittings.
1
Hot
Cold
150mm
33~43mm
Hot
Cold
3
2
4
25
28
27
26
14
17
12
13
16
5
7
11
6
8
9
10
15
How to Install the Shower Column
Rehearse slide bar kit(14) installation for the base(6) mounting location
determination. Connect the tube joint(9) and the base(6)(
Note
: The arrow
in the base is upward), tighten them with screw(10). Set the other end of
the tube joint on the supporter(11).
Put the washer(15) onto faucet outlet(16). Connect the faucet outlet(16)
and slide bar kit(14). Place the slide bar kit upright and parallel to the
finished wall. Mark the holes of base with a pencil on the finished wall.
Uninstall the slide bar kit and tube joint.(
Note
: Don’t lose the screws.)
Drill holes in the finished wall according to the diameter of the anchors(5)
and the position of mounting base. Insert the anchors into the holes.
Secure the mounting base by self-tapping screws(7). (
Note
: The arrow in
the base is upward).
Ensure the washer(15) on the faucet outlet. Install the tube joint(9) and
escutcheon(8) onto the supporter. Connect the slide bar kit and faucet
outlet. Slide the tube joint onto the base. Screw the slide bar kit onto the
faucet with strap wrench or soft cloth between the nut and regular
wrench. Make sure the slide bar kit is parallel to the finished wall. Tighten
the screw(10) with hex wrench(17). Screw the escutcheon until it against
wall.
Remove and discard the guard from the tube kit(12). Install the tube kit
into the slide bar kit. Then screw the nut(13) onto the slide bar kit with
strap wrench or soft cloth between the nut and regular wrench. Make
sure the outlet of the tube kit faces front.
18
20
22
22
23
24
21
19