background image

 

1112039-A02-I    Apr 2019

    6

Kohler New Zealand

9. Loosen the 

 r

o

t

c

e

n

n

o

c

 

e

p

i

p

 

e

t

s

w

 

e

h

ti

F

 .

d

e

r

i

u

q

e

r

 f

t

r

o

p

p

u

s

 

e

p

i

p

 

e

t

s

w

 .

t

r

o

p

p

u

r

o

t

c

e

n

n

o

e

p

i

p

 

e

t

s

w

 

e

h

k

c

o

d

n

a

 

n

e

t

h

g

it

 e

h

m

o

rf

 t

h

g

i

e

h

 t

c

e

r

r

o

e

h

e

r

e

p

i

p

 e

t

s

w

 . 

r

a

s

s

e

c

c

e

n

 f

t

s

u

j

d

a

 

d

n

a

 

s

n

o

it

c

u

r

t

s

n

s

r

e

r

u

t

c

a

f

u

n

a

m

 .

t

e

l

n

r

e

t

w

  

k

n

a

e

h

o

)

d

e

il

p

p

u

s

 t

o

n

(

Summary of Contents for 4179A-NA

Page 1: ...ot be responsible for any damage due to the installation s t r a p e r a p s d e v o r p p a n o n f o a e W pp c e r ia r u o y e t com m t i m en o K o t t hler quali y t Pleas m w e f a e k a t e i...

Page 2: ...design Easy installation for stud Easy maintenance Space saving Rough in 10 200 300 1107 1297 230 180 35 135 438 478 88 MIN Unit mm 90 MIN 63 0 140 400kg 400 10 l l a w n i e h t f o n o i t a l l a t...

Page 3: ...eir full supplied with the tank Use lubricant as required and ensure enough of the screw is explosed to mount and secure the toilet Nut Allen Key Adjustable Bracket 3 Place the frame into the cavity s...

Page 4: ...ted in the toilet manufactures instructions r e v o l l a f o t d e w o l l a t o n d n a d e t r o p p u s s i e m a r f e h t e r u s n E E T O N Nut Allen Key Adjustable Bracket l e v e l s i g o n...

Page 5: ...d Nog Vertical Stud Pencil 7 Fix the nog to the studs Nog Nog Fixing Hole Coach Tek Screw M8 Not Supplied 8 Attach the frame to the nog and also the studs at all 6 xing hole points Use minimum M8 coac...

Page 6: ...p p u s e p i p e t s a w t r o p p u s r o t c e n n o c e p i p e t s a w e h t k c o l d n a n e t h g i t e h t m o r f t h g i e h t c e r r o c e h t e r a e p i p e t s a w y r a s s e c c e n...

Page 7: ...h Plate Shield Screw Flush Plate Shield Knife 13 Using a sharp knife Trim the ush plate shield back level with the nished wall If the nished wall is to be tiled please ensure the thickness of the tile...

Page 8: ...n o c e p i p e h t e v o m e R Gasket Flush Pipe Connector Waste Pipe Connector Gasket Ruler Pencil n o k r a M 7 1 the pipe connectors a second line which represents the e h t n e e w t e b e c n a...

Page 9: ...Plate installation 20 Ensure that the green cap is tightened Fix the locking plate to the ush plate shield using the plastic locking bolts To lock the bolts in position turn the bolt until the tab on...

Page 10: ...Full Flush Reduced Flush Tab Cover Locking Plate Remove and Maintenance of Outlet Valve Cover w r e v o c e h t d l o H 1 it d n a s d n a h h t o b h e h t f o p o t e h t e t a t o R d r a w p u h s...

Page 11: ...ng nut and remove the ll valve Nut Shut off valve 7 Note the orientation of the e v l a v h s u e h t m o r f s g e l e h t e v o m e R s g e l ush e v l a v b e h t g n i k o o h n u y b as e h t m o...

Page 12: ...Rotate the base of the ush valve out through the access panel 12 To replace the ush valve follow this instruction in reverse order Flush valve adjustment Adjustment Switch Float Full Flush Adjust the...

Page 13: ...ng Adjust the ush rods Ensure the ush valve legs are installed in the correct orientation and connected correctly Float level of the inlet valve requires adjusting Water level too high or low The ush...

Reviews: