1122791-A02-G Apr 2019 5 Kohler New Zealand
9. Cut both the waste pipe and
flush pipe at the connection distance
marks. Remove all burrs from the
cut
edges and reinstall on the toilet.
e locking
plate and push the co
v
er into the position.
Cover
Lock
Cover
Tab
Locking
Plate
Full
Flush
Reduced
Flush
Locking
Plate
Locking
Bolts
Flush
Rod
Unthreaded
End
10. Fix the locking plate to the flush
plate shield usaing the plastic locking
bolts. To lock the bolts in position turn
the bolt until the tab on the bolt head is
vertical. Trim the length of the locking
bolts if required.
Lock nuts
Flush Plate installation
11.
S
c
rew the
fl
ush rods into the
fl
ush
a
c
tuator until the unthreaded end of
the rod is flush with the locking plate.
Ensure the
fl
ush rod is se
c
ured
through the
square
holes at the rear
of the flush actuator.
Test the flush action to ensure it is
moving smoothly. Adjust the flush
rod as required and then tighten the
lock nuts to prevent adjustment over time.