![Koehler K41091 Operation And Instruction Manual Download Page 6](http://html1.mh-extra.com/html/koehler/k41091/k41091_operation-and-instruction-manual_1984935006.webp)
K41091 Micro Carbon Residue and Ash Tester
Operation and Instruction Manual
K41091-Manual
-
4-
3 Getting Started
The instructions for preparing the equipment
assume that the user is aware of the contents of
this document, which lists the warranty conditions
and important precautions.
3.1 Packing List
K41091 Micro Carbon Residue and Ash Tester
Cleaning Cable (1)
RS232 Serial Cable (2)
Software Disc (3)
Mixed Vial Holder (4)
Large Vial Holder (5)
Small Vial Holder (6)
Pipe Chimney Extension (7)
Hook for Safe Hot Lid Handling (8)
Hot Lid (9)
Insulating Lid (10)
Gas Connection Tubing (11)
Power Cord (12)
K41091-Manual Micro Carbon Residue and Ash
Tester Operation and Instruction Manual
Number designations refer to Figure 1 below:
Additional
Accessories
and
Consumables
Available (order separately):
Part No.
Description
K41000-7
Gas Connection Kit - 2 Gas
Outputs
K41000-9
Holder for 25-50-100 g Porcelain
Crucibles
K41000-1
Pack of 6 Porcelain Crucibles, 120
ml, Tall Form
K41000-10
Pack of 6 Porcelain Crucibles, 40
ml, Tall Form
K41000-11
Pack of 6 Porcelain Crucibles, 80
ml, Low Form
K41000-2
2 mL Borosilicate Glass Sample
Vial
K41000-3
16 mL Borosilicate Glass Sample
Vial
K41100-3
16 ml vials (pack of 144) for single
use
K41100-4
2 ml vials (pack of 144) for single
use
K41000-4
2 ml Quartz sample vial, re-usable
(Ash Content Test)
K41000-5
16 ml Quartz sample vial, re-
usable (Ash Content Test)
K41000-8
4 ml Borosilicate glass sample
tube (MRC test)
3.2 Unpacking
Carefully unpack and place the instrument and
accessories in a secure location. Ensure that all
items listed on the packing list are present. Inspect
the unit and all accessories for damage. If any
damage is found, keep all packing materials and
immediately report the damage to the carrier. We
will assist you with your claim, if requested. When
submitting a claim for shipping damage, request
that the carrier inspect the shipping container and
equipment. Do not return goods to Koehler without
written authorization.
3.3 Setup
Equipment Placement.
Place the instrument on a
firm, level table in an area with adequate
ventilation or in a hood. The unit may be leveled
by making minor turning adjustments to the feet
located at the base of the unit. Please note that
Koehler does not supply a level with this
equipment.
The apparatus has had to be at room
temperature for several hours before to be
energized in order to avoid the risk of
condensation.
Ventilation.
A fume hood or exhaust system is
required when operating the unit. Flammable
vapors and/or steam are generated during
operation and must not be permitted to
accumulate. A canopy-style hood may be used if
the height from the top of the unit to the canopy is
5 feet or less. The exhaust blower should have a
rating of 1000 C.F.M. or greater.
Summary of Contents for K41091
Page 2: ......