Kobold DKF Operating Instructions Manual Download Page 4

DKF 

page 4 

 

DKF K01/1115 

5. Mechanical Connection 

5.1 Before installation 

  Remove all packing materials and transport restraints and ensure that no such 

materials remain in the device. 

  Make sure that the maximum operating pressure and temperature of the device 

are not exceeded. (see section 6.Technical Information..) 

  Install the flow indicator in the piping system, ensuring that the piping is rigidly 

supported at the inlet and outlet of the unit with pipe clamps 

  Ensure that the piping is aligned with the inlet and outlet fittings and the no 

piping induced stresses are exerted in the indicator. This stress can result in 
damage to the device during system operation 

  Protect the device from external damage.  

  Avoid pressure surges within the indicator chamber, such as those arising from 

fast start up/shut off of flow or pulsating flow. 

  If possible, after completing the mechanical installation, check the threaded 

connection between the device and the piping for leakage immediately.  

 
 
 

6. Technical Information 

Maximum Temperature: 

 

120 °C 

Maximumg Pressure: 

 

6 bar 

 
 
 

Reviews: