![KOBE CH2230SQ Installation Instructions And Operation Manual Download Page 13](http://html1.mh-extra.com/html/kobe/ch2230sq/ch2230sq_installation-instructions-and-operation-manual_1981865013.webp)
11
STAND ALONE INSTALLATION – TOP VENT
***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
- Use duct tape to seal the joints between pipe sections.
- If necessary, prepare back wall frame with cross framing lumber for secure installation.
- Using references on Table 2 and measurements on page 22-23, decide the level of the
lumber. Refer to Figure 14.
Hood Preparation before Installation
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood and the duct cover (if any).
- Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.
Figure 13 Figure 14
Figure 15
6
"
Round Vent 7
"
Round Vent 3-1/4
"
x 10
"
Vent
Summary of Contents for CH2230SQ
Page 2: ...ENGLISH 1 FRENCH 32 SPANISH 63...
Page 25: ...23 Hood Mounting Bracket Duct Cover Mounting Bracket...
Page 27: ...25 MODEL NO CH2230SQ CH2236SQ...
Page 28: ...26 CIRCUIT DIAGRAM MODEL NO CH2230SQ CH2236SQ...
Page 56: ...54...
Page 58: ...56 Nos de mod les CH2230SQ CH2236SQ...
Page 59: ...57 DIAGRAMME DES CIRCUITS Nos de mod les CH2230SQ CH2236SQ...
Page 87: ...85 Soporte de Montaje de la Campana Soporte de Montaje de la Cubierta de Conductos...
Page 89: ...87 MODELO NO CH2230SQ CH2236SQ...