KOBE CH22 SQB-5 Series Installation Instructions And Operation Manual Download Page 13

 

10 

 

4.  For Rear 3-1/4” x 10” vent installation only: 

Remove  attached  6”  exhaust  and  discard.  
(Figure  10)  Keep  13  screws  to  install  vent 
covers. 

Remove duct knockout from back of the hood 
and  discard.  (Figure  12)  Unscrew  3-1/4”  x 
10”  Vent  Cover  from  rear  exhaust  (located 

inside hood); keep screws to install 

3-1/4” x 

10” Exhaust. 

Align  Top  Vent  Cover  {E}  and  3-1/4”  x  10” 
Vent  Cover  (removed  from  rear  exhaust) 
using  14  screws  (13  screws  taken  from  6” 
exhaust).  (Figure 12) Follow instructions in 
Step 5 to attach Hood Mounting Bracket {M} 
and  two  Duct  Cover  Support  {N}  using  14 
screws  (13  screws  taken  from  6”  exhaust).  
(Figure 14) 

Attach  the  3-1/4”  x  10”  Exhaust  {D}  to  rear 
exhaust  (located  inside  hood)  using  10 
screws taken from rear vent cover.  (Figure 
13) 

 

Hood Installation 

 CAUTION:  If  moving  the  cooking  range  is 

necessary to install the hood, turn off the power 
in  an  electric  range  at  the  main  electrical  box.  
SHUT OFF THE GAS  BEFORE MOVING A GAS 
RANGE.    And  use  a  protective  covering  to 
protect  cooktop  and/or  countertop  from 
damage. 

5.  Secure  Hood-Mounting  Bracket  {M}  and  two 

Duct Cover Support {N} on top of the hood with 
eight pre-attached screws.  Use four 3/16” x 3/8” 
screws  {L}  for  Hood-Mounting  Bracket  {M}.  
(Figure 14) 

6.  Using references on Table 2 and measurements 

on  page  17-18,  mark  the  leveling  point  of  the 
hood.  Position two moutning screws (provided) 
on the wall, leaving 1/8” away from the wall as 
shown in Figure 15. 

7.  Align  Hood-Mounting  Bracket  {M}  to  the  two 

screws  on  the  wall  and  hook  hood  into  place.  
Tighten screws to secure hood to the wall. 
 

 CAUTION:  MAKE SURE HOOD IS SECURE 

BEFORE RELEASING. 
 
 
 
 
 
 
 

Figure 12 

 
 
 
 
 
 
 
 
 
 
 

 

Figure 13 

 
 
 
 
 
 
 
 
 
 
 

 

Figure 14 

 
 
 
 
 
 
 
 
 
 
 

Figure 15 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Mounting Screws 

Summary of Contents for CH22 SQB-5 Series

Page 1: ...KOBE Range Hoods Deluxe Series CH22 SQB 5 Series Model No Under Cabinet CH2230SQB 5 30 CH2236SQB 5 36 Wall Mount CH2230SQB WM 5 30 CH2236SQB WM 5 36 INSTALLATION INSTRUCTIONS AND OPERATION MANUAL...

Page 2: ...T INSTALL THE UNIT AND KEEP ALL ORIGINAL PACKAGING MATERIAL 2 Have your original invoice as proof of purchase and product serial number ready 3 Contact your merchant for product replacement due to shi...

Page 3: ...E 15 SPECIFICATIONS 16 MEASUREMENTS DIAGRAMS 17 PARTS LIST 19 CIRCUIT DIAGRAM 21 TROUBLE SHOOTING 22 WARRANTY 23 WARRANTY INFORMATION FORM 25 READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING A L L W I...

Page 4: ...atment negligence or any other circumstances beyond the control of KOBE RANGE HOODS authorized agents Any repair carried out without the supervision of KOBE RANGE HOODS authorized agents will automati...

Page 5: ...ou still smell gas call the Gas Company and Fire Department right away CAUTION 1 For general ventilation use only Do not use to exhaust hazardous or explosive materials and vapors 2 To reduce the risk...

Page 6: ...tainless Steel Spacer x 2 30 hood I Wire Cap x 3 J Screws Package for Under Cabinet only A B C D E F G H I J K Adjustable Duct Cover L Screws Package M Hood Mounting Bracket N Duct Cover Support x 2 O...

Page 7: ...o Ceiling B Height of Floor to Counter Top Standard 36 C Preferred Height of Counter Top to Hood Bottom Minimum 26 to 30 D Height of Hood E Height of the Cabinet FOR WALL MOUNT WITH OPTIONAL DUCT COVE...

Page 8: ...RY SHARP EDGES PLEASE WEAR PROTECTIVE GLOVES IF REMOVING ANY PARTS FOR INSTALLING CLEANING OR SERVICING NOTE BE CAREFUL WHEN USING ELECTRICAL SCREWDRIVER DAMAGE TO THE HOOD MAY OCCUR Installation Cont...

Page 9: ...d on each side Figure 2 Using reference on Page 17 to measure and create access opening for electrical wires and exhaust under the cabinet Vent option installation CAUTION USE HAND TOOLS ONLY DO NOT O...

Page 10: ...sh with the front of the cabinet 7 Draw electrical wires through cabinet access opening 8 Use electrical drill to remove the knockout holes on top of the range hood 9 Place screws provided into the ex...

Page 11: ...ctwork Use duct tape to make all joints secure and air tight Install Accessories 11 Place baffle filters spacers underneath the hood Figure 7 Final Assembly 12 Turn power ON in control panel Check all...

Page 12: ...g lumber for secure installation Using references on Table 2 and meansurements on page 17 18 decide the level of the lumber Refer to Figure 9 Vent option installation CAUTION USE HAND TOOLS ONLY DO NO...

Page 13: ...Figure 13 Hood Installation CAUTION If moving the cooking range is necessary to install the hood turn off the power in an electric range at the main electrical box SHUT OFF THE GAS BEFORE MOVING A GA...

Page 14: ...en to house wires and cap with wire connectors 9 Store wires in the wiring box Ductwork Installation 10 Use steel pipe to connect the exhaust on the hood to the ductwork Use duct tape to make all join...

Page 15: ...ssories 15 Place baffle filters spacers underneath the hood Figure 18 Final Assembly 16 Turn power ON in control panel Check all lights and fan operation 17 Make sure to leave this manual for the home...

Page 16: ...iately press button a second time Light Control Press button to turn LED lights ON Each press of button will cycle the light intensity through Bright Medium Bright Dim and OFF Lights are controlled in...

Page 17: ...deactivate press and hold control button until icon no longer appears in the LED Display NOTE Pressing button while ECO Mode is active will activate the regular fan function and the speed will be disp...

Page 18: ...pots Use dry soft towel to dry the hood 3 DO NOT allow deposits to accumulate or remain on the hood 4 DO NOT use ordinary steel wool or steel brushes Small bits of steel may adhere to the surface and...

Page 19: ...pic particles and odors to promote a cleaner kitchen environment LIGHTS 3 Level Lighting 3 watt LED light x 2 30 36 3 watt LED light x 3 42 48 HOOD DIMENSION W x D x H CH2230SQB 5 and CH2230SQB WM 5 2...

Page 20: ...millimeters Inch measurements are estimated All measurements in are millimeters FOR UNDER THE CABINET MODEL NO CH2230SQB 5 30 CH2236SQB 5 36 30 Knockout Holes A 36 Knockout Holes B FOR WALL MOUNT DUC...

Page 21: ...18 Hood Mounting Bracket Duct Cover Mounting Bracket Duct Cover Support...

Page 22: ...Motor B X5 L1 0301 0120 102B 12 Motor A X5 L1 0301 0120 102A 13 Turbine Impeller B L1 0251 0747 B 14 Turbine Impeller A L1 0251 0747 A 15 Processor Board L1 0404 6001 B 16 Plastic Oil Tunnel L1 0502...

Page 23: ...20 MODEL NO CH2230SQB 5 and CH2230SQB WM 5 30 CH2236SQB 5 and CH2236SQB WM 5 36...

Page 24: ...21 CIRCUIT DIAGRAM MODEL NO CH2230SQB 5 and CH2230SQB WM 5 30 CH2236SQB 5 and CH2236SQB WM 5 36...

Page 25: ...ounting bracket The motor is working but the lights are not working LED light fixture s is defective Replace LED light fixture s The light wiring s is loose Check wire continuity from processor board...

Page 26: ...ed States and Canada It is non transferable and applies only to the original purchaser and does not extend to subsequent owner of this product In Hawaii Alaska and Canada this warranty is limited Ther...

Page 27: ...ervice you will be responsible for all expenses associated with the requested service including parts labor shipping travelling and any other expense related to the service request TO REQUEST WARRANTY...

Page 28: ...urpose 1 Date of purchase 2 Model No 3 Serial No For warranty service or spare parts purchase contact KOBE Service Center Toll Free 1 877 BUY KOBE 289 5623 Email customer service koberangehoods com Fo...

Page 29: ...s recommand d utiliser cette hotte l tranger puisque l alimentation lectrique pourrait ne pas tre compatible et enfreindre le code de l lectricit de ce pays L usage de la hotte KOBE l tranger est votr...

Reviews: