9
ASSEMBLY INSTRUCTIONS
12. Attach the small drawer front (18) to the left drawer side
panel (15L) and right drawer side panel (16R) by inserting
screws (BB) through the small drawer front (18) and into
the side panels (15L and 16R). Insert (DD) screws through
parts (15L and 16R) and into sides of drawer front (18).
Attach the small drawer back (19) to the left and right
drawer side panels (15L and 16R) by inserting screws (BB)
through the side drawer panels (15L and 16R) and into
the large drawer back (21).
Hardware Used
BB
M4x6 mm
Screw
x 6
DD
x 4
12
13. Insert the small drawer bottom panel (17) into the
drawer assembly and attach with the screws (BB).
Note:
The additional holes in the drawer bottom are
there for drainage in the event of a spill.
Hardware Used
BB
M4x6 mm
Screw
x 4
Repeat steps 12 and 13 to assemble the second
small drawer. Set the drawers aside. They will be
installed later in the procedure.
13
14. Attach the large drawer front (22) to the left drawer side
panel (15L) and right drawer side panel (16R) by inserting
screws (BB) through the large drawer front (22) and into
the side panels (15L and 16R). Insert (DD) screws through
parts (15L and 16R) and into sides of drawer front (22).
Attach the large drawer back (21) to the left and right
drawer side panels (15L and 16R) by inserting screws (BB)
through the side drawer panels (15L and 16R) and into
the large drawer back (21).
Hardware Used
BB
M4x6 mm
Screw
x 13
14
15L
16R
DD
BB
BB
18
19
17
BB
20
21
16R
15L
DD
22
DD
M3.2x6 mm
Screw
x 4
M3.2x6 mm
Screw