
CoolAdd
®
Manual / Bedienungsanleitung
CoolAdd
01.998.350.0 issue a
page / Seite 25/59
9.2 Checklist for unit installation
Checked performed
Completed
(After completion confirm with
signature)
Comments
Check unit for damage on delivery
Check alignment and stability
under load of the existing cabinet
Assembling as point 5.2
No packaging materials left in the
CoolAdd
All installation tools removed
Cable connections checked
Cooling water connection does not
leak
Pressure test performed
Cooling water network bled
Cooling water flow rate adjusted
Condensed water tray connected
to drain
Fan function checked
Air return temperature adjusted
.............................................
........................................
....................
Place:
Date:
Signature
Checker