Knightsbridge SPIKEGUBK Installation & Maintenance Manual Download Page 3

INSTALLATION 

•  Provide power to the required point of installation (refer to BS7671 for correct cabling 

methods). Suitable IP rated junction boxes should be used where required

•  The power source connections should be local and accessible via a suitable IP rated 

enclosure

•  Choose a position for the luminaire ensuring that the ground is suitable to firmly hold the 

spike and luminaire in position. Check that the ground is not liable to flooding and the 
spike does not infringe with any underground pipes or cables (see Fig. 1)



Fig.1

Reviews: