• Reattach the diffuser and replace screws
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying
out an emergency duration test
• Ensure the earth lead on the LED plate is
secured correctly to the earth lead on the body
of the fitting
• Connect the battery to the inverter
• Fasten the LED plate screws
• Choose the required colour temperature by
means of the DIP switch (see Fig. 5)
3
WARNING
GENERAL
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed
This product should be recycled in the correct manner when it reaches the end of its life. Check local
authorities for where facilities exist
The batteries in this luminaire are Lithium Ion and must be disposed of correctly. Please contact the local
authorities for the disposal of this toxic waste
Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the
product
This product is non-dimmable
SHExxEM
These instructions should be read carefully and retained after installation by the end user for future reference and
maintenance.
These instructions should be used to aid installation of the following products:
SHE1BEM / SHE1GEM / SHE2BEM / SHE2GEM
SAFETY
•
This product must be installed in accordance with the latest edition of the IEE Wiring Regulations
(BS7671) and current Building Regulations. If in any doubt, consult a qualified electrician
•
Please isolate mains prior to installation or maintenance
•
Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating
of the circuit cable, fuse or circuit breaker
•
Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for
installation
•
This product is Class I and must be earthed
•
This product is IP65 rated
INSTALLATION
•
Provide power to the required point of installation. Suitable IP rated junction boxes should be used
where required
•
Remove the diffuser removing the four screws using the Allen key provided (see Fig. 1)
Remove screws
Fig. 1
•
Remove the fastening screws securing the LED plate and lift out
•
Mark the location of the fixing holes, and drill the holes ensuring not to infringe with any gas / water
pipes or electrical cables
•
Feed the cable via the rubber grommet to retain IP rating, and secure the baseplate to the surface
•
Connect the Live (brown), Neutral (blue) and Earth (green/yellow) to the terminals on the terminal
block ensuring the cable is secured in the cable clamp
•
Wire for non-maintained operation (Fig. 2), maintained operation (Fig. 3) or switched-maintained
operation (Fig. 4) as required
Fig. 2
Fig. 3
Fig. 4
•
Ensure the earth lead on the LED plate is secured correctly to the earth lead on the body of the
fitting
•
Connect the battery to the inverter
•
Refasten the LED plate screws
•
Choose the required colour temperature by means of the DIP switch (see Fig. 5)
Fig. 5
•
Reattach the diffuser and replace screws
•
Switch on and check for correct operation, ensuring the green indicator LED is illuminated
•
We recommend, on commissioning the installation, a minimum charge period of 24 hours before
carrying out an emergency duration test
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed
GENERAL
This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities
for where facilities exist
Fig. 3
Fig. 4
•
Ensure the earth lead on the LED plate is secured correctly to the earth lead on the body of the
fitting
•
Connect the battery to the inverter
•
Refasten the LED plate screws
•
Choose the required colour temperature by means of the DIP switch (see Fig. 5)
Fig. 5
•
Reattach the diffuser and replace screws
•
Switch on and check for correct operation, ensuring the green indicator LED is illuminated
•
We recommend, on commissioning the installation, a minimum charge period of 24 hours before
carrying out an emergency duration test
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed
GENERAL
This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities
for where facilities exist
Fig. 3
Fig. 4
•
Ensure the earth lead on the LED plate is secured correctly to the earth lead on the body of the
fitting
•
Connect the battery to the inverter
•
Refasten the LED plate screws
•
Choose the required colour temperature by means of the DIP switch (see Fig. 5)
Fig. 5
•
Reattach the diffuser and replace screws
•
Switch on and check for correct operation, ensuring the green indicator LED is illuminated
•
We recommend, on commissioning the installation, a minimum charge period of 24 hours before
carrying out an emergency duration test
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed
GENERAL
This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities