These instructions should be read carefully and retained after installation by the end user for future
reference and maintenance.
These instructions should be used to aid installation of the following products:
EMPOWER2 / EMPOWERW2
GENERAL INSTRUCTIONS
SAFETY
INSTALLATION
• Installation of this luminaire should only be carried out by a qualified electrician or competent
person to the latest Building and current IEE Wiring Regulations (BS7671)
• Please isolate mains prior to installation/maintenance
• Check the total load on the circuit (including when this luminaire is fitted) does not exceed the
rating of the circuit cable, fuse or circuit breaker
• Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for
installation
• Installing in areas where the temperature consistently drops below 0°C may shorten the battery
life /duration
• We recommend a minimum charge period of 24 hours before doing an emergency duration test
• This product is Class II double insulated
• This product is non-dimmable
• This product is IP20 rated
• Provide power to the required
point of installation
• Prepare cut-out in the desired
surface as per the cut-out details
in Fig 1, ensuring that it does not
infringe with electrical cables,
water/gas pipes or ceiling joists
• Connect the luminaire to the mains supply via a suitable junction box ensuring the correct
polarity is observed (see Fig 2). Live (brown), Neutral (blue) & Switched Live (red)
EMPOWER2 & EMPOWERW2
These instructions should be read carefully and retained after installation by the end user for future reference and
maintenance.
These instructions should be used to aid installation of the following products:
EMPOWER2 & EMPOWERW2
SAFETY
•
Installation of this luminaire should only be carried out by a qualified electrician or competent person to the
latest Building and current IEE Wiring Regulations (BS7671)
•
Please isolate mains prior to installation/maintenance
•
Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse or circuit breaker
•
Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation
•
Installing in areas where the temperature consistently drops below 0°C may shorten the battery life
/duration
•
We recommend a minimum charge period of 24 hours before doing an emergency duration test
•
This product is Class II double insulated
•
This product is non dimmable
•
This product is IP20 rated
INSTALLATION
•
Provide power to the required point of installation
•
Cut-out in the desired surface as per the cut-out details in Fig 1, ensuring that it does not infringe with electrical
cables, water/gas pipes or ceiling joists
Fig 1
•
Connect the luminaire to the mains supply, via a suitable junction box, ensuring the correct polarity is observed
(see Fig 2). Live (brown), Neutral (blue) & Switched Live (Red)
45mm
Switched Live
Live
Neutral
Fig 1
Fig 2
EMPOWER2 & EMPOWERW2
These instructions should be read carefully and retained after installation by the end user for future reference and
maintenance.
These instructions should be used to aid installation of the following products:
EMPOWER2 & EMPOWERW2
SAFETY
•
Installation of this luminaire should only be carried out by a qualified electrician or competent person to the
latest Building and current IEE Wiring Regulations (BS7671)
•
Please isolate mains prior to installation/maintenance
•
Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse or circuit breaker
•
Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation
•
Installing in areas where the temperature consistently drops below 0°C may shorten the battery life
/duration
•
We recommend a minimum charge period of 24 hours before doing an emergency duration test
•
This product is Class II double insulated
•
This product is non dimmable
•
This product is IP20 rated
INSTALLATION
•
Provide power to the required point of installation
•
Cut-out in the desired surface as per the cut-out details in Fig 1, ensuring that it does not infringe with electrical
cables, water/gas pipes or ceiling joists
Fig 1
•
Connect the luminaire to the mains supply, via a suitable junction box, ensuring the correct polarity is observed
(see Fig 2). Live (brown), Neutral (blue) & Switched Live (Red)
45mm
Switched Live
Live
Neutral