Knightsbridge BF1430EM Installation & Maintenance Manual Download Page 6

Recommended routine test procedure in accordance with BS5266 

• Daily check – check LED charge indicator is illuminated

• Monthly functional test - simulate a mains supply failure for approx. 30 seconds by operation of key switch 

or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is 

illuminated

• Annual 3-hour duration test - simulate a mains supply failure for 3-hour continuous test by operation of key 

switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator 

is illuminated

• If the luminaire fails any of the above tests, please contact a qualified electrician. See below/overleaf for test 

record sheet

TESTING FOR EMERGENCY LUMINAIRES

Reviews: