background image

Page 4

Assembly Instructions

knightgroup.co.nz

Page 4

Assembly Instructions

Insert threaded dowel pins (p1) in to panels X, Z and Y as desired shelf height. Put the two panels E on the top of 
threaded dowel pins (p1) as illustrated.

Step 4

Fix cams on panel X, Y, Z and D into cam bolts (c1) on panel G and tighten in a clockwise direction as illustrated. 
Use cam stickers (c2) to cover the top of all the cams.

Step 3

Cubit Credenza

Summary of Contents for Cubit Credenza

Page 1: ...knightgroup co nz Tools Required Powered Screwdriver Assembly Instructions Cubit Credenza ...

Page 2: ...and or cause bodily harm to the user or persons nearby Don t locate furniture in direct sunlight or near air conditioning inlet or heating radiator Don t put high temperature or frozen objects on furniture Safely carry product to location of assembly Retain this operation manual pass it on to any future owner SET UP AND INSTALLATION Assemble the product according to the assembly instructions To pr...

Page 3: ... Instructions Cubit Credenza Parts Item Description Quantity A Top Panel 1 X Left Side Panel 1 Z Right Side Panel 1 D Back Panel 1 G Bottom Panel 1 E Moveable Shelf 2 Y Vertical Panel 1 V1 Door Panel 1 V2 Door Panel 1 V3 Door Panel 1 V4 Door Panel 1 ...

Page 4: ...4 g1 Hinge Stand 8 s13 4x25 Screw 18 IMPORTANT Please note the difference between parts g2 and g3 Each hinge is specifically designed for their unique position Correct installation is essential for a successful assembly of this credenza Parts c1 6x35 Cam Bolt s13 4x25 Screw g1 Hinge Stand d1 8x30 Dowel Pin k4 Lock g2 Big Curve Hinge Mount Plate V1 and V4 c2 Cam Sticker k1 Lock Catch g3 Small Curve...

Page 5: ... designed for their unique position Correct installation is essential for a successful assembly of this credenza 1 Insert cams bolts c1 and dowel pins d1 into panels A G X and Z as illustrated above 2 Fix hinge stands g1 to panels X Z and Y with screws s1 as illustrated above 3 Fix hinge bodies g2 to panels V1 and V4 with screws s1 as illustrated above 4 Fix hinge bodies g3 to panels V2 and V3 wit...

Page 6: ...lock catches on door panels V1 V2 V3 V4 and top panel A 7 Fix lock k4 to panel V2 and V4 with screws s1 as illustrated above 8 Fix lock catch k5 to panel V1 and V3 with screws s1 as illustrated above 9 Fix lock catch k1 to panel A with screws s1 as illustrated above Cubit Credenza s1 k1 k5 k4 k4 k5 s1 s1 s1 s1 ...

Page 7: ...s Step 2 Cubit Credenza Top panel A back panel D left side panel X right side panel Z vertical panel Y assembly 1 Fix cams on panel X Z Y D into cam bolts c1 on panel A and tighten in a clockwise direction as illustrated above Cams Holes on the panel Y should face to panel X ...

Page 8: ... to panels X Z and Y as desired shelf height Put the two panels E on the top of threaded dowel pins p1 as illustrated Step 4 Fix cams on panel X Y Z and D into cam bolts c1 on panel G and tighten in a clockwise direction as illustrated Use cam stickers c2 to cover the top of all the cams Step 3 Cubit Credenza ...

Page 9: ...Page 5 Assembly Instructions knightgroup co nz Page 5 Assembly Instructions Step 5 Door panel V1 V2 V3 and V4 assembly Cubit Credenza ...

Page 10: ...Page 6 Assembly Instructions knightgroup co nz Page 6 Assembly Instructions Complete Cubit Credenza ...

Reviews: