background image

Installation Instructions

Frame Cube Shelving

244-BK

Tools Required (not included):

- Power Drill
- 3/32" Drill Bit or 3/16" Drill Bit
- Screwdriver
- Tape Measure
- Level

Installation Materials (included):

-  (3) Frame Cubes
- Mounting Hardware

Load Rating:

-  50 lbs each cube when mounted  

onto studs 

Installation

:

STEP 1: 

Select installation areas and mark the keyhole locations on wall the correct  

distance apart. Use a level to make sure the ledges will be straight, as shown in 

Figure 1

.

STEP 2: 

Pre-drill pilot holes with a 3/32" drill bit in the marked locations. If a stud is 

present, insert and fasten the screw leaving a 5/32" gap. If no stud is present, use a 3/16" 
drill bit to enlarge the 3/32" hole. Insert the anchor and fasten the screw into the anchor 
leaving a 5/32" gap, as shown in 

Figure 2

.

STEP 3: 

Attach each ledge by placing the keyholes over the screws and applying a light 

downward force, as shown in 

Figure 3

.

Figure 1

Level

Back of  

Frame Cube

Figure 2

1/16"

1/16"

Dr

ywall

Dr

ywall

Stud

Figure 3

x

x

2700 Oak Industrial Dr. NE

Grand Rapids, MI 49505

800-253-1561 

www.kv.com

[email protected]

©2015 Knape & Vogt. KV and the KV logo are trademarks of Knape & Vogt.        310461/0715

Reviews: