
2
Tillage Tool Options: ················································································ 41
Finishing Tool Options: ············································································· 42
OPERATIONAL SET-UP
Tractor Preparation:
Front End Weights ·············································································· 43
Horsepower Requirements ···································································· 43
Sway Blocks ······················································································· 43
Wheel Spacing ···················································································· 43
Drawbar Position ················································································ 43
Hitching to the Implement:
Mast & Hitch Configurations ································································· 44
Tractor Hook-Up ················································································ 45-49
Leveling Implement Tool Bar:
Leveling Side to Side ············································································ 50
Leveling Front to Rear ·········································································· 50
Implement Preparation:
Ripper Shank Tools
Tripped Shank Clearances ··························································· 51
Reset on the Go Shank ································································· 51
Toggle Trip Shank ······································································ 52
Depth of Penetration ············································································ 53
Toolbar Gauge Wheel Adjustment··························································· 54
Front Coulter Adjustment ····································································· 55
Cover Crop Roller Adjustment ······························································· 56
Tillage Linkage Arm Adjustment ···························································· 57
Tillage Tool Adjustment ········································································ 58
Finishing Tool Adjustment ···································································· 58
Start-Up: ······························································································· 59
MAINTANENCE
Service Schedule ······················································································ 60
Lubrication Points ··················································································· 61-64
Tire Inflation Chart ·················································································· 64
Wear Item Replacement ············································································ 65-68
Storage ·································································································· 68