background image

 

36IN 100L GOLD SLEIGH 

ITEM NUMBER: TY-A-100L/2W-3(36) 

 

A. Side of the Panel 

Qty

2pcs 

 

 

 

 

 

 

B. Runner 

Qty

2pcs 

C. Front/seat/hind Panel -Each   

Qty

1pc 

D. Bow-         

Qty

1pc  

 

 

 

 

E. Plastic Ties 

 

F. Ground Stake     

Qty

4pcs 

           

 
 
 
 
 
 
 
 
 

ASSEMBLY INSTRUCTIONS

                                                                       

 
 
 
 
 
 
 
 
 
 
 
 
 
STEPS: 
(1)Carefully remove all of the parts from the box and place on a flat surface. Check the Parts 
List to make sure all of the parts are included. If there are any plastic covers to protect the end 
of metal rod tips, remove the covers before assembly. 
(2)Unfold each Side of the Panel (Part #A) and Runner (Part #C) of Sleigh. Insert the rods of the 
Panel into the matching holes of the runner;The runners come with metal bars to stabilize the 
Sleigh.Attach the bars to the opposite side runner and fasten them with Plastic 
ties(Part#E) ,(See FIG.1,2). 
(3)Unfold the panel(Part#C),the front panel ,seat panel and hind panel.Insert the rod of the front 
panel and hind panel into the holes of the seat panel(See FIG.3);Insert the rods of all panel into 
the matching hole at the each side of the Panel(See Fig.4).Insert the wires of the Bow(Part #D) 
through the holes of the side of the panel,then twist the wires together.(See FIG.5) 
 
 
 
 
 
 
 
 
 
 
 
 
 
(5) Secure the sculpture to the ground with the Ground stakes (Part # F,See FIG.5). 
(6) Plug in. 
 
 
 

FIG.1                                                    FIG.2

 

FIG.3                            FIG.4                            FIG.5

 

Reviews: