Kleinwächter EFM 113B Manual Download Page 7

 

Grounding 

Grounding

 

 

The appliance must be grounded to get real measuring results.  

You can connect ground by the access line (pin3) or over the optional aluminum clamp 

Maintenance 

 

Don´t touch the modulator system ! 
Time by time the modulator-system needs to be cleaned and a new offset – adjustment with 
shielded field-plate is necessary. For cleaning use a lint-free cotton cloth.  
 

 

Caution ! 

 Absolute avoid a deformation of the modulator. 

 

Warranty 

 

By normal use conform to this manual we give you a warranty of 24 moth.  

By opening the housing you lose the warranty. 

 

Warning - Instructions 

 

 

This measuring - head is not for measuring in explosive-areas ! 

 

The usage in power-installations is not allowed ! 

 

With this unit it is not possible to measure alternated fields  > 1 Hz. 

 

The static-field meter has to be grounded every time. 

 

The first measurement must be made in a sufficient distance, so that the maximal 

possible surface-potential is detected in a safe distance. 

 

Sparkle-discharge to the modulator-system can destroy the electronic and is to avoid 

absolutely. 

Parts of delivery 

 

 

Electro field meter 

 

shield cap 

 

access line 3m 

 

Manual 

 

Calibration certification 

Summary of Contents for EFM 113B

Page 1: ...113B Small stationary static field meter with high sensitivity to measure static DC fields and electrostatic charge according the field mill influenz principle Output analogue current signal 1mA Syste...

Page 2: ...ription 3 Technical Data 4 Legend 4 Operating instructions 5 Measurement method 5 Field of application 5 Zero adjust 5 Calculating the charge 5 Pinning 6 Optional accessories 6 Aluminum clamp with thr...

Page 3: ...be generated The reason is a transfer of electrons between the two materials Since the charge of electrons is negative the material depleting electrons has a positive charge compare the material enhan...

Page 4: ...acitor 200mm x 200mm Distance 25mm Ranges 5kV m 20kV m 50kV m und 200kV m Tolerance 5 Power supply 9 15V DC ca 60mA Operating time By 8 hours a day min 2 years Interface Analogue 1mA Current Interface...

Page 5: ...static charges and extreme highly resistive voltage supplies Before Measure remove the red cap on the modulator system Zero adjust First put on the red cap on the modulator system Then select the 5kV...

Page 6: ...maximum cable length 0 14 mm is 50m Range selection Pin 1 4 open H Pin 1 4 connect to ground L Optional accessories Aluminum clamp with thread Aluminum clamp with thread To mount the measuring head o...

Page 7: ...manual we give you a warranty of 24 moth By opening the housing you lose the warranty Warning Instructions This measuring head is not for measuring in explosive areas The usage in power installations...

Page 8: ...recommend a new calibration every year Cable assignment Standard cable Pin color Function 1 white Range select B 2 brown Power supply 9 15V DC 3 black Ground GND 4 blue Range select A 5 grey Output cu...

Reviews: