Installation & Operation Manual:
Automated Forklift Entryway Sanitizing System
_________________________________________________________________________________________________
17 |
P a g e
Figure 18
Figure 19
PRIMING THE SYSTEM:
The system is now ready for priming and use. Actuate the pumping module by pushing in
on the Prime Button and releasing. Each time the button is pushed the unit will run until it
times out. When the nozzles have achieved a spray pattern the priming is complete.
Check to make sure there are no leaks at connection points. Make sure all tubing
connections have been fully inserted into the push fit style fittings.
*Note,
if the prime button fails to actuate the pump, it is most likely that the photo
electric sensor has been inadvertently switched into the wrong mode. To correct this
condition, See the section below on setting the photo sensor.
*Note,
if the pump fails to prime after 3 or 4 actuations, disconnect the pump discharge
tubing from one of the nozzles or branch tee fittings and place in/over a suitable
container. Reattempt to prime the system again until some fluid exits through the
disconnected fitting. Once the pump has been primed you may reconnect the tubing to
the fitting. This method should only be required upon initial startup with a dry pump or
following an extended shutdown where the pump was allowed to completely dry out.