background image

STEP 5

Connect D, E with B:

Note: Make sure all the given points otherwise 

it will not fix properly.

 

STEP 6

Connect C with D, E, F:

Note: Make sure all the given points otherwise 

it will not fix properly.

 

STEP 7

Connect A to Above Set with B, D, C, E:

Note: Make sure all the given points otherwise 

it will not fix properly.

 

INDIANA STUDY TABLE

G0223IT0377 / G0223IT0378 / G0223IT0376

How to Connect Buffers at Bottom Base

2. Connect Given 

Buffers at this 

marks by nails 

or screws

1. Different types of Buffers

2.

Having Problems with INSTALLATION???

Got a Broken Part??? | DON’T WORRY !!

JUST CALL / WHATSAPP 

+919537597067

INSTALLATION GUIDE

Reviews: