
11
EN
ASSEMBLY
Please place the thermowell inside the fermenter and secure in place with an
M14 nut
Place the black plug into the hole of thermowell, then get the probe of
thermometer go through the small hole of plug. A digital thermometer can also
be used directly with thermowell.
Insert the racking arm into the inlet of ball valve.
Unscrew the detachable feet. Adjust it to an ideal height and fi x it with screw
and nut.
Screw on hose barb and SS plug as shown. Secure with M14 Nut.
Summary of Contents for Garkeller Pro
Page 2: ......
Page 8: ...8 DE...
Page 14: ...14 EN...
Page 20: ......
Page 26: ......
Page 32: ......
Page 33: ......
Page 34: ......