
34
EN
INSTALLATION
When install a Heat pipe Refrigerator, ventilation should be considered seriously, please
refer to the following:
•
There should be left at least 200 cm³ for ventilation
•
The distance between wall and refrigerator side should be at least 20mm
•
The bottom should be left at least 50mm for air flowing
• Air passing through must not be preheated
• Entire cooling system should be considered in the ventilation
the following four pictures show four installation ways:
Summary of Contents for 10005399
Page 2: ......
Page 8: ...8 DE GER TE BERSICHT Modelle mit Glast r...
Page 32: ...32 EN PRODUCT OVERVIEW Model with glass door...
Page 56: ...56 FR APER U DE L APPAREIL Mod le avec porte vitr e...
Page 80: ...80 ES VISTA GENERAL DEL APARATO Modelos con puerta de cristal...
Page 104: ...104 IT PANORAMICA DEL DISPOSITIVO Modelli con porta in vetro...
Page 123: ......
Page 124: ......