7. Locate the hook and loop
fasteners closest to the centre
of the underside of the canopy
and wrap around poles to
secure tightly.
Complete last part of leg pole assembly to erect
frame.
8. Position pad feet at the four corners. Unroll the
webbing straps from the corners and connect
them to the side
release buckles on
the corresponding
corner. This stops
the corners from
‘splaying’ out when
the steel poles are
inserted.
Note: Pad feet must
angle toward centre
of shelter with vertical
slots facing outward.
Webbing tape to be on
outside of pad feet.
9. Insert ends of poles
into pad feet and
twist until metal
pin locks into slot.
Repeat for other three
pad feet locations.
Adjust to form square
webbing tape to be
firm
10. Drive pegs through
holes in pad feet
to secure BEFORE
proceeding to Step 13.
Note: Two pegs are provided per pad foot.
Additional pegs may be required, depending on
soil type.
11. Attach hook end of canopy tension strap to square
slot on the pad feet. Repeat for the remaining
three pad feet. Pull down strap, at each corner to
tighten.
12. Wrap web straps around pole at all four corners
and close snap-in buckles. Pull strap to tighten.
14. Fine tune the canopy so it remains taut and
positioned correctly over the frame.
15. If required, attach the optional solid wall to chosen
side of the shelter.
REVERSE THE PROCEDURE TO LOWER THE SHELTER.
PACKING INSTRUCTIONS
Pack the poles and pegs into their bags. Fold the
shelter from each side to the centre and in half again.
Adjust to the length of the poles. Place the poles onto
the floor and roll them inside so that the floor is on
the outside. Store and pack the shelter in its bag.
Metal
pin in
slot
Web Loop
Guy Rope
Peg
Completed Shelter
Angle faces
inward
Slots
13. Attach guy ropes to web loops located on outside
seams of canopy then secure with pegs.