background image

CED MANUAL

SECTION:

DM

PREPARED BY: BKC

DM0122

DATE: 4-7-20

A

COMPANY

BETTER SOLUTIONS. BETTER BUILDINGS.

DM0122

K

INSULATED TRANSLUCENT PANEL INSTALLATION INSTRUCTION FOR PURLINN SPACING OTHER THAN 5'-0"

ROOF PURLIN

UP

 SLO

PE

OUTER TRANSLUCENT PANEL

'H9320'

PREVIOUS PANEL RUN

DOWN SLOPE
ROOF PANEL

UPSLOPE PANEL

INNER TRANSLUCENT PANEL MK.

'H9320'

UNDER DOWNSLOPE AND PREVIOUS

PANEL EDGES

ERECTOR NOTES

1. ERECT TRANSLUCENT PANEL IN THE SAME SEQUENCE AS A METAL
PANEL (U.N.O.).INNER TRANSLUCENT PANEL UNDERNEATH THE
PREVIOUS AND DOWN SLOPE PANELS.

2. BE SURE TRANSLUCENT PANEL & TAPE SEALANT ARE FREE OF DUST
& DEBRIS BEFORE INSTALLATION.  ALL PANELS & MASTIC MUST BE
ASSEMBLED BEFORE FASTENERS ARE INSTALLED.

3. FASTENERS MUST PENETRATE THE TAPE SEALANT.

4. USE 3/16" x 7/8" TAPE SEALANT AT ALL LAPS AND PANEL STRAPS.

5. NEVER STEP, STAND OR APPLY WEIGHT TO TRANSLUCENT PANELS.

SEC

TIO

N B

SEC

TIO

N A

INSIDE CLOSURE

'H3440'

INSIDE CLOSURE

'H3440'

3/16" x 7/8" TAPE

SEALANT

'H3440'

INSIDE CLOSURE

INSIDE CLOSURE

'H3440'

SIDE STRAP

'TPK'

UNDER BOTH SIDELAPS AS SHOWN

IN SECTIONS "A" & "B"

(THE STRAP DOES NOT ATTACH

 TO THE PURLINS)

Reviews: