Kirby Morgan KMB 18 Quick Start Manual Download Page 5

Kirby Morgan, SuperLite, Band Mask, KMB Band Mask,  EXO, SuperMask, SuperFlow, and Rex  are all registered trademarks of 

Kirby Morgan Dive Systems, Inc.  Use of these terms to describe products that are not manufactured by KMDSI is not permitted without 
written permission from KMDSI. 
       © Copyright 1970-2017 Kirby Morgan Dive Systems, Inc.  All rights reserved.  KMDSI manuals, checklists and technical and training 
information is made available for the express use of owner/user of this Kirby Morgan products.  No part of this material may be reproduced, 
stored in any retrieval system, or transmitted, or used in any form or by any means, whether graphic, electronic, mechanical, photocopy, or 
otherwise by technology known or unknown, without the prior written permission of Kirby Morgan Dive Systems, Inc 

Copyright 2003-2017, Dive Lab®., Inc. All rights reserved.  TechTrnG 03101 

 
 

STEP 

PROCEDURES 

INITIALS 

6.  

Check the 

Demand 
Regulator 
Adjustment 

 

Note:  

If the Purge  

      Button travels  
      further than 1/8”  
      (3mm) before 
      gas starts  
      flowing, or has 
      a weak flow of  
      gas when fully  
      depressed,  
      adjustment of the 
      regulator  is  
      necessary.   
      

Guidance O&M 

Manual

 

a.

  Rotate out (counterclockwise) on the Demand 

Regulator Adjustment Knob until a slight free 
flow develops.  Then rotate in (clockwise) 
until the free flow stops.

 

 

b.

  For masks equipped with a SuperFlow or 

SuperFlow 350 regulator, slowly depress the 
purge button to check for excessive travel.  
The purge button should travel in no less that 
1/16” and out no more than 1/8” (1.5-3.0mm) 
before gas flow is heard.  For masks equipped 
with a 450 or 455 balanced regulator 
depressing the flexible cover the cover should 
travel approximately ¼” (6mm) before gas 
starts to flow.

 

 

c.

  Depress the Purge Button all the way, verify a 

strong surge of gas.  Pressing the flexible 
cover of the 450 and 455 further than 1/4" 
(6mm)

 

should result in a strong flow of gas.

 

 

d.

  Ensure the Side Block 

Emergency Valve is 

closed

, and the 

Bail Out Cylinder Valve is 

open.

 Log the cylinder pressure _____ psig. 

 

7.  Check the 
 Communications 

Diver:

 

Perform communications check. 

 

8.  Check the Hot 

Water Supply 
(if applicable) 

Tender:

 

Check the hot water supply connections.  Ensure 
topside supply has been switched to the diver and 
verify flow to hot water shroud and suit (if used). 

 

9.  Check the Dry 

Suit Inflation 
Hose (if 
applicable) 

Tender:

 

Check the dry suit Inflation Hose Connection.  
Ensure the dry suit Inflation Valve and Exhaust 
Valve function properly. 

 

10.  Check the 

Entire Rig 

Tender:

 

Soap and leak check the Mask gas fittings and 
connections including the EGS. 

 

11.  Check the 

Diver’s Entire 
Rig 

Supervisor/Tender:  Check adjustment/fit of 
the entire rig, including the following (a-d): 

 

a.

  Diver’s Safety Harness

 

 

Reviews: